PART II — Section II — Plan & Equipment Questionnaire <br />Item 1— <br />upon continuous suitable weather conditions, we will mobilize to the project and barricade the bottom <br />of the west 51h Level bay. This will be completed using type -III single side reflectivity barricades weighted <br />with sand bags. Access from stairwell will be restricted by either signage inside of door or, if allowed, <br />locking of doors provided that no fire codes are violated by doing so. Notice will be posted at all landings <br />and inside all elevators. Dumpster and facilities will be ordered on site and located in agreed upon <br />locations. <br />Work will proceed on completing all concrete deck repairs on 5-West, 6-East, and 6-West. During this <br />time, removal of all stripes and traffic markings will be completed. Once these items are complete, we will <br />proceed with shot -blast surface preparation of all surfaces receiving Silane Sealer per manufacturers <br />instruction as well as project specifications. Silane Sealer will be applied at rates prescribed by <br />manufacturer and be allowed to cure for 7-days as per project specifications. During the 7-day cure all <br />joints identified for removal and replacement will be completed. Once complete, and the 7-day waiting <br />period expires, all stripes and traffic markings in area will be reapplied in original configuration and in <br />colors as specified. After traffic marking paint has dried per installer recommendations, area will be <br />opened to public traffic. <br />Next area (5-East and 4-West) will be cordoned off for construction, but different than Phase -I a modified <br />traffic lane will be maintained for access to parking areas above current work areas. Same processes will <br />proceed as in Phase-1, with the following exception — when shot-blasting and sealer application are <br />commenced, the area will be restricted to traffic for public safety. This will need to be coordinated with <br />the project engineer on this and all remaining phases to completion. At the completion of each phase, the <br />process will begin again to the next lower level. <br />Phases are as follows: <br />Phase-1: 6W(Qtr. Bay), 6E, 5W <br />Phase-2: 5E, 4W <br />Phase-3: 4E, 3W <br />Phase-4: 3E <br />Each phase is anticipated to take 2-3 weeks for completion. It is possible to shorten project duration if <br />completed in three phases: <br />Phase-1: 6W(Qtr, Bay), 6E, 5W,5E <br />Phase-2: 4W, 4E <br />Phase-3: 3W, 3E <br />2 <br />