Laserfiche WebLink
FYI ... H.B. Fuller permit includes the following: <br />1) H.B. Fuller shall report flow monthly. <br />2) H.B. Fuller Authorized Representative shall sign all reports including but not limited to <br />Periodic Compliance Reports (PCR), Slug Control Plans, Flow Measurement Plans, and <br />corrective actions in response to permit violations. <br />3) H.B. Fuller, LLC shall submit a "Flow Measurement Plan" within ninety (90) days of the effective <br />date of this permit, as described in Part Ill (I). <br />4) H.B. Fuller, LLC shall notify the Pretreatment Group orally within twenty-four (24) hours of <br />becoming aware of a permit violation, and must follow up in writing with details and corrective <br />action within five (5) days. <br />5) H.B. Fuller, LLC shall submit a Slug Control Plan within ninety (90) days of the effective date of <br />this permit. This plan shall be resubmitted every even numbered year, 2016, 2018, 2020... Please <br />see Part (III ) (F) for details. <br />6) Only the Authorized Representative shall be required to sign the certification statement <br />found in Part III (A) (3). <br />7) Section Part IV (B) (15) has been added in order to clarify the requirements concerning the <br />Authorized Representative. <br />8) For all after hour (after 4:30 PM) required oral notifications call: 574-277-8515 and dial <br />zero (0) to reach an operator. <br />H.B. Fuller . Industrial Wastewater Discharge Permit Page 1 of 30 <br />