Laserfiche WebLink
City of South Bend Project No. 117-06OR <br />Change Order No. 1-12112/17 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Kara M. Boyles, P.E. <br />Professional Engineer No. 10809510 <br />CONTRACTOR: HRP Construction <br />PROJECT: Newman Center Site Development, Division B & C <br />Project No. 117-06OR <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: December 12, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item <br />QtV <br />Unit <br />Price <br />Total <br />1. HMA Surface <br />120.73 <br />TON <br />$106.05 <br />$12,803.42 <br />2. Drywell <br />1 <br />LS <br />$9,600.00 <br />$9,600.00 <br />Total: $22,403.42 <br />1. HMA Surface <br />Eddy St. needs to be milled and resurfaced to allow for proper drainage to newly <br />proposed and existing structures. <br />2. Drywell <br />A drywell is needed to be installed on Eddy St. in order to capture storm water on the <br />west side of the crown. HMA will be graded to reach the grate without any curb or sidewalk <br />removal. <br />