My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Newman Center Site Development Divisions B & C Proj No 117-060R - HRP Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No 1 - Newman Center Site Development Divisions B & C Proj No 117-060R - HRP Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:32:30 PM
Creation date
12/13/2017 2:51:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 117-06OR <br />Change Order No. 1-12112/17 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Kara M. Boyles, P.E. <br />Professional Engineer No. 10809510 <br />CONTRACTOR: HRP Construction <br />PROJECT: Newman Center Site Development, Division B & C <br />Project No. 117-06OR <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: December 12, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item <br />QtV <br />Unit <br />Price <br />Total <br />1. HMA Surface <br />120.73 <br />TON <br />$106.05 <br />$12,803.42 <br />2. Drywell <br />1 <br />LS <br />$9,600.00 <br />$9,600.00 <br />Total: $22,403.42 <br />1. HMA Surface <br />Eddy St. needs to be milled and resurfaced to allow for proper drainage to newly <br />proposed and existing structures. <br />2. Drywell <br />A drywell is needed to be installed on Eddy St. in order to capture storm water on the <br />west side of the crown. HMA will be graded to reach the grate without any curb or sidewalk <br />removal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.