QUOTE TABULATION
<br />Project Name: 100 Wayne Street Plaza and Streetscape
<br />Project Not 116-047R
<br />For Quotes Due: November 14, 2017
<br />BASE BID
<br />Item No, Description Quantity Unit
<br />1
<br />MobliizagonlDamobillzalion
<br />1
<br />LSum
<br />2
<br />Construction Engineering
<br />1
<br />LSum
<br />3
<br />Concrete Sidewalk Removal
<br />318
<br />SYS
<br />4
<br />Temporary Inlet Protection
<br />2
<br />LSum
<br />6
<br />Maintenance of Sidewalk Traffic
<br />1
<br />LSum
<br />6
<br />Concrete Ramp Relplacemenl
<br />20
<br />SYS
<br />7
<br />Plaza Specialty Paving
<br />288
<br />SYS
<br />a
<br />Washed Sand sell€ng Had. 3/4"
<br />2
<br />CYS
<br />9
<br />#12 Aggregate Base, 1 112"
<br />11
<br />CYS
<br />10
<br />Geoteldile Fabric
<br />266
<br />SYS
<br />11
<br />Concrete Steps Replacement
<br />32
<br />SYS
<br />12
<br />Top Soil Planters
<br />13
<br />cYS
<br />13
<br />Mulch
<br />5
<br />CYS
<br />14
<br />Trees, Omamental
<br />6
<br />Each
<br />15
<br />1perrervials
<br />84
<br />Each
<br />16
<br />LldouelBulbs
<br />116
<br />Each
<br />Base Bid Total
<br />ALTERNATES
<br />Item No, Description Quantity Unit
<br />Alt, #1 -Plaza Waterproof Membrane
<br />17 1 Plaza Waterproof Membrane 265 SYS
<br />Alternate #1 Total
<br />Alt. #2 -All Work In the Streetscape Zone
<br />18
<br />Construction Engineering
<br />1
<br />LSum
<br />19
<br />Concrete and Paver Removal
<br />120
<br />SYS
<br />20
<br />Curb, Flush, Concrete
<br />10
<br />LF
<br />21
<br />Curb Ramp, Concrete
<br />2
<br />SYS
<br />22
<br />Concrete Sidewalk Replacement
<br />Sao
<br />SYS
<br />23
<br />Tree Removal
<br />4
<br />LSum
<br />24
<br />Trees, Canopy
<br />4
<br />Each
<br />25
<br />Tree Grates and R-Frame
<br />4
<br />Each
<br />26
<br />Ornamental Light Poles
<br />4
<br />Each
<br />27
<br />Light Pale Foundation
<br />4
<br />Each
<br />28
<br />Light Pale ConduitlWhing
<br />1f2
<br />LF
<br />29
<br />Perrenials
<br />84
<br />Each
<br />30
<br />Mulch
<br />5
<br />CYS
<br />31 jTopsoil
<br />13
<br />CYS
<br />Alternate #2 Total
<br />Alf. 93 -All Work In the West Planting Zone
<br />32
<br />Brick Paver Removal
<br />39
<br />5Y5
<br />33
<br />Concrete Sidewalk, 4"
<br />5
<br />SYS
<br />34
<br />Top Soil, 12"Depth
<br />12
<br />CYS
<br />35
<br />Mulch
<br />4
<br />CYS
<br />36
<br />Perreniais
<br />86
<br />Each
<br />Alternate 93 Total
<br />ASt. #4 - All Work In the Parking Landscape Zone
<br />37
<br />Mulch
<br />12
<br />CYS
<br />38
<br />Trees
<br />4
<br />Each
<br />39
<br />Shrubs
<br />18
<br />Each
<br />40
<br />Pemenials
<br />62
<br />Each
<br />41
<br />LidopoiBulbs
<br />642
<br />Each
<br />Alternate #4 Total
<br />Other Alternates
<br />42
<br />AIL #5 - Monument Lighting
<br />3
<br />Each
<br />43
<br />Alt. #6 - Monument Signage
<br />1
<br />LSum
<br />44
<br />AIL 47 - Decorative Benches
<br />2
<br />Each
<br />45
<br />Alt. 98 - New Plaza Planters
<br />3
<br />1 Each
<br />Other Alternates Total
<br />Zlolkowsio Construction, Inc.
<br />Unit Price Item Total
<br />Rieth-Riley Construction Co.,
<br />Inc.
<br />Unit Price Item Tota€
<br />Premium Generale Services,
<br />Inc.
<br />Unit Price Item Total
<br />$61.163.00
<br />$ 61.163.00
<br />$12.734.00
<br />$ 12,734,00
<br />$ 11,000.00
<br />$ 11,000.00
<br />$ 5.000.00
<br />$ 5,000,00
<br />$ 8.390.00
<br />s 8,390.00
<br />$ 3.500.00
<br />$ 3,500.00
<br />$ 90.00
<br />$ 28.620.00
<br />$ 36.35
<br />S 11,559,30
<br />$ 65.00
<br />$ - 20,670.00
<br />$ 500.Oo
<br />S 1,000,00
<br />$ 250.00
<br />$ 500.00
<br />$ 500.00
<br />S 1,Ooo.0o
<br />$ 4,000.00
<br />$ 4.000.00
<br />$ 4.541.24
<br />S 4,541,24
<br />$ 1.200.00
<br />$ 1.200.00
<br />S 90.00
<br />$ 1,800,00
<br />$ 145.00
<br />$ 2,900.00
<br />$ 100.00
<br />S 2,000.00
<br />$ 198.00
<br />$ 52,668.00
<br />$ 212.22
<br />S 66,450,52
<br />$ 245.00
<br />$ 65,170.00
<br />$ 620.00.
<br />$ 1.240,00
<br />$ 1.310.00
<br />$ 2,620.00
<br />$ 1.600.00
<br />$ 3,000.00
<br />$ 80.00
<br />$ 880.00
<br />$ 507.64
<br />S 6,584,04
<br />$ 600.00 1
<br />$ 6,600.00
<br />$ 10.00
<br />$ 2,660,00
<br />S 3,40
<br />$ 904.40
<br />$ 6.00
<br />$ 1,330.00
<br />$ 90.00
<br />$ 2,880.00
<br />$ 1.200.001
<br />$ 38,400.00
<br />$ 300,00
<br />$ 9,600.00
<br />$ 110.00
<br />$ 1,430.00
<br />S 78,60
<br />$ 994.50
<br />$ 90.00
<br />$ 1,170.00
<br />$ 75.00
<br />$ 375.00
<br />$ loom
<br />$ 500.00
<br />S 115.00
<br />$ 575.00
<br />$ 420.00
<br />$ 2.520.00
<br />S 450,00
<br />$ 2.700.00
<br />$ 660.00
<br />$ 3,3a0.00
<br />$ 20.00
<br />$ 1.280.00
<br />$ 3ZG0
<br />$ 2.048.00
<br />S 37,00
<br />$ 2,368.00
<br />$ 4.00
<br />$ 464.00
<br />$ 12,00
<br />$ 1.392.00
<br />$ 15.00
<br />$ 1,740.00
<br />$ 167,980.00
<br />$ 182,218,00
<br />S 134,223.00
<br />Unit Price It., Total
<br />Unit Price Item Total
<br />Unit Price Item Total
<br />$ 204.00
<br />$ 54,060.00
<br />S 71.33
<br />$ 18,902.45
<br />S 90.00
<br />S 23,050,00
<br />$ 54,060.00
<br />$ 18,902.45
<br />$ 23,850.00
<br />$ 2,000.00
<br />$ 2,000.00
<br />S 1,692,50
<br />$ 1692,50
<br />$ 3,000.00
<br />$ 3,000.00
<br />$ 60.00
<br />$ 25,200.00
<br />$ 23.50
<br />$ 9,870.00
<br />$ 50.00
<br />$ 21,0W.00
<br />$ 30.00
<br />$ 300.00
<br />$ 214.00
<br />$ 2.140,00
<br />$ 85.00
<br />$ 850.00
<br />$ 63.00
<br />$ 126.00
<br />$ 3,033.00
<br />$ 6,066.00
<br />$ 400.00
<br />3 e0o.00
<br />$ 90.00
<br />$ 34,200.00
<br />$ 84.00
<br />$ 31,920.00
<br />$ 48.00
<br />$ 18,240.00
<br />$ 650.00
<br />$ 2,600,00
<br />$ 1.700.00
<br />$ 6,800.00
<br />$ 100.00
<br />$ 400.00
<br />$ 700.00
<br />$ 2,800.00
<br />$ 735.00
<br />$ 2,940.00
<br />$ 756.00
<br />$ 3.024.00
<br />S 3,550.00
<br />$ 14,200,00
<br />$ 3.757.00
<br />$ 15,028.00
<br />$ 1.750.00
<br />$ 7.000.00
<br />$ 7,000.00
<br />$ 28,000.00
<br />$ 5.750.00
<br />S 23,000.00
<br />$ 5,600.00
<br />$ 22.400.00
<br />$ 850.00
<br />S 3,400,00
<br />$ 650.00
<br />$ 2,600.00
<br />$ 1,100.00
<br />$ 4.400.00
<br />S 30.00
<br />$ 3,360.00
<br />$ 22.50
<br />S 2,520.00
<br />5 35.00
<br />&l 3,920.00
<br />S 20.00
<br />S 1,680.00
<br />$ 32.00
<br />$ 2,688.00
<br />$ 37.00
<br />$ 3,108.00
<br />$ 76.00
<br />S 375.00
<br />$ 100.00
<br />$ 500.00
<br />$ 115,00
<br />$ 576,00
<br />s 110.00
<br />S 1,430.00
<br />$ 76.50
<br />$ 994.50
<br />$ 80.00
<br />$ 1,170.00
<br />$ 119,674.00
<br />$ 108,759.00
<br />$ 89,887.00
<br />S 45.00
<br />$ 1,755.00
<br />$ 163.00
<br />$ 5.967.00
<br />$ 116.00
<br />$ 4,290,00
<br />$ 45.00
<br />$ 225.00
<br />S 239,00
<br />$ 1.196.00
<br />$ 80.00
<br />$ 400.00
<br />$ 200,00
<br />$ 2,400.00
<br />$ 76.50
<br />$ 918.00
<br />$ 9D,co
<br />$ 1,08Q00
<br />$ A00
<br />S 300.00
<br />$ 100,00
<br />$ 400.00
<br />$ 115.00
<br />$ 460.00
<br />$ 20,00
<br />$ 1,760.00
<br />$ 32.00
<br />$ 2.816.00
<br />$ 37.00
<br />S 3.258,00
<br />$ 6,440.00
<br />$ 11,296.00
<br />$ 9,486.00
<br />$ 75.00
<br />$ 900.00
<br />$ 100.00
<br />$ 1,200.00
<br />S 115.00
<br />$ 1.300.00
<br />$ $20,00
<br />S 1,280.00
<br />$ 435.00
<br />$ 1,740.00
<br />$ 500.00
<br />S 2,000.00
<br />$ 60.00
<br />$ 1,080.00
<br />$ 403.50
<br />$ 1,863,00
<br />$ 120.00
<br />$ 2,160.00
<br />$ 20.00
<br />$ 1,240,00
<br />S 32.00
<br />$ 1,984.00
<br />$ 37.00
<br />$ 2,294.00
<br />$ 4.00
<br />$ 2,568.00
<br />s 12.00
<br />$ 7,704,00
<br />S 15.00
<br />$ 9,630.00
<br />$ 7,068.00
<br />$ 14,491.00
<br />$ 17,464.00
<br />S 2,030.00
<br />S 6,090,00
<br />S 880.00
<br />S 2,640.00
<br />$ 825.00
<br />$ 2.476.00
<br />5 7,730.00
<br />$ 7,730.00
<br />$ 8.509.00
<br />S 8.508,00
<br />$ 14,500.00
<br />$ 14.500.00
<br />$ 1,600.00
<br />$ 3,200,00
<br />$ 2,508.00
<br />$ 5,016.00
<br />$ 1,325.00
<br />$ 2.650.00
<br />$ 1.030.00
<br />$ 3.090.00
<br />S 1.823.00
<br />$ 5.469.00
<br />$ 1.700.00
<br />$ 6,100.00
<br />S 20,110.00
<br />$ 21,634.00
<br />$ 24,725.00
<br />Nen-C011uslon Affadavi! IYes IYes Yes
<br />I hereby certify That the above truly and accurately represents quotes received forlhis project on November 14, 2017.
<br />Kara Boyles, city Engineer
<br />Page 1 of 1