Laserfiche WebLink
REGULAR MEETING <br />NOVEMBER 28, 2017 363 <br />Bid was signed by: Mike Bacsa <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted <br />BID: Base Bid Total: $168,300.00 <br />B.C. MECHANICAL, INC <br />882 Anderson Road <br />Niles, MI 49120 <br />Bid was signed by: Mike Fields <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted <br />BID: Base Bid Total: $157,000.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were <br />referred to Engineering for review and recommendation. <br />OPENING OF BIDS — WASTEWATER TREATMENT PLANT HEADWORKS INFLUENT <br />GATE IMPROVEMENTS — PROJECT NO. 117-026 (UTILITIES WASTEWATER <br />CAPITAL) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />HRP CONSTRUCTION INC. <br />5777 Cleveland Road <br />PO Box 266 <br />South Bend, IN 46624 <br />Bid was signed by: Matthew Cain <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted <br />BID: $966,500.00 <br />Section <br />Number <br />Section Title <br />Manufacturer <br />Alternate Deduct <br />43 26 33 <br />Sluice Gates <br />(A)Rodney Hunt Company <br />XXXXX <br />and <br />(Domestically Sourced) <br />Appurtenances <br />(B) Rodney Hunt Company <br />(Globally Sourced) <br />(A) Coldwell Wilcox <br />XXXXX <br />(Domestically Sourced) <br />(B) Coldwell Wilcox <br />(Globally Sourced) . <br />(B) Globally Sourced <br />Alternate: <br />BOWEN ENGINEERING CORPORATION <br />8802 N Meridian Street <br />