Laserfiche WebLink
380 <br />There being no further business to come before the Board, <br />at 11: 55 A. NI . <br />Attest: <br />Clerk <br />SPECIAL MEETING <br />September 15, 1955 <br />MCINTYRE & JONES <br />520 E. SAMPLE STREET <br />SOUTH BEND, INDIANA. <br />TOTAL ITEM EX <br />Completion date <br />A non -collusion affidavit <br />and bid bond in the amount <br />of 5% of the Bid, and Form <br />96-A accompanied the bid. <br />ION 1,2,3,4,5,6,7,8,9 <br />10, 11, 12, 13, & 14......p8896.50 <br />60 calendar days. <br />All of the foregoing street improvement bids were referred to the consulting <br />engineers for tabulation and recommendations. <br />The Board next took note of the letter of Charles F. Morfoot, under date of <br />.September 10, 1955, addressed to Mayor John A. Scott, and, in the matter of the possible <br />need for traffic signals at the inters2ction-of Madison and Eddy Streets, referred this <br />'suggestion to Traffic Engineer, E. H. Miller for investigation and report. <br />The Board next considered the Traffic Engineerts need for four two-way three -section <br />.traffic signal heads and nine one-waytwo-section traffic signal heads, approved the <br />purchase of this equipment and directed the Clerk to proceed accordingly. <br />The Board then approved the installation of YIELD RIGHT OF WAY signs at each of <br />.the following locations: <br />Northwest corner of Ford at Sample Street <br />Southeast corner of Canterbury at Elwood Avenue <br />Northwest corner of Sussex Drive at Ardmore Trail <br />Both sides of Marine Street at Bowman. <br />Excavation Bond in the sum of $1�000.00 was examined and approved for Goheen <br />Plumbing and Heating Co., Inc. <br />Contractorts Bond in the sum of $1,000.00 was examined and approved for Floyd <br />J. Wachowiak. <br />the meeting was adjourned: <br />A special meeting of the Board of Public Works was held at 10:00 A.Mi., Thursday, <br />September 15, 1955, for the purpose of awarding contracts for street improvements on <br />Olive Street, Ewing Avenue and Miami Street. Mr. J. A. Bickel was absent. <br />Upon recommendation by the consulting engineer, the Board awarded the contract <br />for the widening of Olive Street from Western Avenue to Washington, (west side only) to <br />McIntyre & Jones-, as they- submitted the lowest and best bid. <br />Rieth-Riley Construction Company was awarded the contract for the paving of <br />Ewing Avenue, from Michigan Street to Franklin Street, as their bid was the lowest and <br />best bid submitted. <br />The bid of Rieth-Riley Construction Company for the construction of hot asphaltic <br />concrete re -surfacing of Miami Street, from Ireland Road to Ridgedale Road, was <br />accepted by the Board and contract awarded accordingly. <br />The Board then gave -further consideration to the matter of the construction of <br />a re-inf orced Portland Cement Concrete Pavement on Sample Street, from Falcon Street <br />to Kentucky Street, and authorized the Clerk to proceed with the required advertising <br />for bids. <br />There being no further business to come before the Board, <br />at 11:15 A. M. <br />E <br />i <br />" A t t e st <br />j' <br />Clerk - <br />the meeting was adjourned <br />• <br />• <br />r1 <br />L <br />• <br />