Laserfiche WebLink
Century Center Vestibule Heater <br />South Bend Project 117-044 <br />M/E Pile #5786 <br />Addendum 41 <br />November 20, 2017 <br />GENERAL: <br />The following items represent additions, modifications and/or clarifications to the Specifications and/or <br />Drawings for this Project. All other aspects of the Drawings and Specifications shall remain unchanged, <br />except as modified herein, or in other addenda. <br />Please read carefully and notify the Engineer promptly of any discrepancies or questions concerning these <br />items. All bidders are cautioned to read these notes carefully and to include all costs in bid for Work as <br />clarified or modified herein. <br />Prime Contractors are solely responsible for submitting copies of this addendum to all subcontractors and <br />suppliers. <br />DRAWINGS <br />SHEET 2: <br />1. GENERAL MECHANICAL DEMOLITION NOTES, #7: <br />Add the following: Remove and reinstall ceiling as required to complete the work. Where <br />removal of the ceiling t-bar grid is required, the Owner will provide replacement t-bar grid for the <br />rusted sections requiring replacement. <br />SHEET 3: <br />I. FAN COIL UNIT SCHEDULE: <br />Add the following: Design airflow is 1900 CFM at 0.25" ESP, and change the heating <br />performance to 150 MBH. Current airflow listed is free flow air. <br />2. RIVER LEVEL MECHANICAL/ELECTRICAL PLAN: <br />Install a circuit -setter (B&G or equal) on the HWR line for each Fan Coil Unit (FCU-I and FCU- <br />2), <br />-This addendum consists of a total 2 pages inclusive of "Acknowledgement of Receipt of <br />Addendum" sheet- <br />