My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Studebaker Museum Rooftop Unit Replacements Project No 117-081 - Dynamic Mechanical Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Studebaker Museum Rooftop Unit Replacements Project No 117-081 - Dynamic Mechanical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 12:09:59 PM
Creation date
11/30/2017 9:20:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S BID FOR PUBLIC WORK <br />CHECKLIST FOR BIDDERS <br />Project Name Studebaker Museum Rooftop Unit Replacements <br />Project No. <br />For Bids Due <br />117-081 <br />November 28, 2017 <br />From time to time the South Bend Board of Public Works finds it necessary to reject a bid <br />because it does not comply with statutory requirements. In preparing your bid, please use the <br />following checklist in order to make sure that your bid is done in the proper manner. <br />V/ Proper bid security included. The bidder has the option of providing either a Certified Check <br />or Bid Bond. <br />Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely <br />executed. <br />/Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments <br />V with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and <br />Certification of use of United States Steel Products or Foundry Products. <br />Proof of MBEIWBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not <br />t/ met, also provide Evidence of Good Faith Efforts Form [MWBE*-2.0] and MBE/WBE Contacted <br />Form [MWBE-2.1]. <br />nowledge Receipt of <br />1� <br />Addendum(s) included with the bid. <br />All required additional information is included with the bid. <br />Proposal statements and other affidavits all signed by the proper party with name either <br />printed or typed underneath signature. <br />This checklist submitted with the Bid. <br />Thin checklist is provided for bidder's use in assuring compliance with required <br />documentation; however, it does not include all specifications requirements and does not <br />relieve the bidder of the need to read and comply with the specifications. ` <br />Bidder: „ �. [) .ULLC Q U ti Cate: l �, 1 [_7 <br />By Authorized Representative: <br />Signature: <br />Print Name & Title: <br />Project No. 117-081 Contractor's Bid for Public Works -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.