Laserfiche WebLink
LFA Project File 9030.48 <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated November 8, 2016. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: November 8, 2016 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. <br />Engineer: Lawson -Fisher Associates P.C. <br />d. Project: South Bend Dam, West Race Repairs <br />City Project No. 115-115 <br />2. Description of .Allodifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />In addition to the contracted Scope of Work for the South Bend Darn, West Race <br />Repairs, LFA will provide the the following services: <br />The proposed work will require work within the regulated floodway and below the <br />ordinary high water mark of the St. Joseph River; therefore, waterway permits will <br />be required. <br />1. Prepare and submit a federal (Army Corps of Engineers) Section 404 <br />waterway permit. <br />2. Prepare and submit a state Section 401 Water Quality Certification will be <br />required from the Indiana Department of Environmental Management <br />(IDEM). <br />3. Prepare and submit an Indiana Department of Natural Resources (IDNR) <br />Construction in a Floodway permit. Hydraulic modeling is not included in <br />this proposal as it is anticipated that the proposed construction activities will <br />meet the requirements associated with the IDNR's non -modeling worksheet <br />(to be included with the permit application). <br />4. Provide followup with regulatory agencies as required for application <br />questions and/or clarification. <br />b. For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />$5,500.00 <br />C. The schedule for rendering services is modified as follows: <br />Page 1 - <br />(Exhibit K-- (Amendment to Owner -Engineer Agreement) -- Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />