Laserfiche WebLink
0 <br />• <br />L� <br />• <br />C <br />• <br />ITEM NO. DESCRIPTION MANUFACTURER <br />0-9 Raw Sewage Pumps, Engine ::Wort1�. ng T=n <br />Drives and Accessories <br />INSTALLED PRIG[E <br />We have carefully analyzed yearly fuel consumptions and electrical <br />energy costs for the different types of engines offered. Our cal- <br />culations indicate that an average annual saving of approximately <br />03500.00 and $750.00 will be effected by selecting engines as pro- <br />posed by Worthington over those proposed by Fairbanks -Morse and <br />Cooper -Bessemer, respectively. These figures are savings to the <br />City over and above the average annual cost for principal and interest <br />requirements of the added initial construction cost. <br />The Board considered additional data presented by the Fairbanks -Morse <br />Company on Items No. 0-8 and 0-9. Provided a belt drive gas compressor <br />were substituted for the electric motor drive originally offered by the <br />manufacturer, C. T. & A. reported that extra annual fuel cost would be <br />reduced from $5, 182.00 to $4o65.00. This reduction would not be <br />sufficient to make the Fairbanks -Morse bid lower on the evaluated basis. <br />Also, claimed was a maintenance differential in favor of Fairbanks -Morse <br />engines. The engineers declined to evaluate this item because of many <br />conflicting claims. The Board then decided it would not be possible to <br />consider the maintenance item as guarantees are not feasible and were <br />not called for in bid proposals. In deciding upon selection of Worthing- <br />ton engines, the decision was provisional upon written guarantees from the <br />Contractor and Manufacturer that fuel consumptions as stated in data file( <br />i with the Owner prior to the bid opening would be met. Failure of the <br />engines on test to meet such guarantees would result in deductions from <br />the contract price equal to fifteen times the calculated added annual <br />fuel cost involved based on continuous.operation of one blower engine <br />and one pump engine at the duty point of the driven equipment as stated <br />in the Equipment Specifications in the Contract. Fuel costs to be com- <br />puted at 10.5 cents per gallon for Diesel oil and 60 cents per lobo <br />cubic feet of 1000 BTU gas. <br />0-10A & <br />0-10B Air Compressors Worthington $2,700.00 <br />Selected on the basis of being the lowest and best bid. <br />0_10C & <br />0-10D <br />Gas Compressors <br />Worthington $15,450.00 i <br />Selected on the basis of being the lowest and best bid. <br />0-11 <br />Air Filters <br />American Air Filter $18,780.00 <br />Selected inasmuch as this was the <br />only bid on this particular equipment. <br />I <br />0-12 <br />Chlorination Equipment (Sub - <br />Item a - Air Master Type) <br />Wallace & Tiernan $15,300.00 <br />Selected on the basis of being the <br />lowest and best bid. <br />II <br />0-13A <br />Cranes & Hoists <br />Manning, Maxwell i <br />Selected on basis of being lowest <br />& Moore $4,185.00 <br />and best bid. <br />0-14 <br />Digester Covers <br />Pacific Flush Tank Co. $186,680.00 aj <br />Selected inasmuch as this was the <br />only bid on this particular equipment. <br />0-15 <br />Gas Storage Spheres <br />Chicago Bridge & Iron $66,o6o.00 <br />Selected as being the lowest and best <br />bid, based on an evaluation <br />given by our engineers, as follows; <br />i <br />We are of the opinion that spheres <br />of either manufacturer are satisfactory, <br />except that possibly there will be <br />somewhat lower maintenance with those <br />as manufactured by Chicago Bridge <br />& Iron due to the types of supporting <br />members. <br />0-16A & <br />0-16B <br />Sludge Heaters (Preheater Type) <br />Pacific Flush Tank Co. $18,700.00 <br />Selected inasmuch as this was the <br />only bid on this particular equipment. <br />o-16c & <br />o-16D <br />Sludge Heaters <br />Pacific Flush Tank Co. $18,56o.00 <br />Selected inasmuch as this was the <br />only bid on this particular equipment. <br />0-17 <br />Meters & Metering Equipment <br />'i <br />Builders -Providence $63,000.00 <br />Selected on the basis of being the <br />lowest and best bid. <br />O-18A <br />Raw Sludge Pumps <br />Chicago Pump Co. $7,460.00 <br />Selected inasmuch as this was the <br />only bid on this particular equipment. <br />0-18B <br />Digested Sludge Pumps <br />Chicago Pump Co. $7,980.00 <br />Selected inasmuch as this was the <br />only bid on this particular equipment. <br />i <br />