Laserfiche WebLink
PRO INDUSTRIAL'" <br />PRO-CRYO UNIVERSAL PRIMER <br />SURFACE PREPARATION <br />SHERWIN-WIWAMS. <br />s <br />APPLICATION <br />WARNING! Removal of old paint by sanding, scraping or other means may generate Refer to the SOS before using <br />dust or fumes that contain lead. Exposure to lead dust or fumes may cause brain Temperature: 40'F minimum <br />damage or other adverse health effects, especially in children or pregnant women. 120°F maximum <br />Controlling exposure to lead or other hazardous substances requires the use of (air, surface, and material) <br />proper protective equipment, such as a properly fitted respirator (NIOSH approved) At least 5°F above dew point <br />and proper containment and cleanup. For more information, call the National Lead Relative humidity: 85% maximum <br />Information Center at 1-500-424-LEAD (in US) or contact your local health authority. <br />The following Is a guide. Changes in pressures and <br />Do not use hydrocarbon solvents for cleaning. tip sizes may be needed for proper spray <br />characteristics. Always purge spray equipment before <br />use with listed reducer. Any reduction must be <br />Iron & Steel - Minimum surface preparation is Hand Tool Cleaning per SSPC-SP2, compatible with the existing environmental and <br />Remove all oil and grease from the surface per SSPC-SP1. For better performance, application conditions. <br />use Commercial Blast Cleaning per SSPC-SP6. Reducer: Water <br />Aluminum - Remove all oil, grease, dirt, oxide and other foreign material per SSPC- <br />SP1.Prjme the area the same day as cleaned. <br />Galvanizing - Allow to weather a minimum of six months prior to coating. Solvent <br />Clean per SSPC-SP1. When weathering is not possible, or the surface has been <br />treated with chromates or silicates, first Solvent Clean per SSPC-SP1 and apply a <br />test patch. Allow paint to dry at least one week before testing adhesion. If adhesion is <br />poor, brush blasting per SSPC-SP16 is necessary to remove these treatments. Rusty <br />galvanizing requires a minimum of Hand Tool Cleaning per SSPC-SP2, prime the <br />area the same day as cleaned. <br />Previously Painted Surfaces - If in sound condition, clean the surface of all foreign <br />material. Smooth, hard or glossy coatings and surfaces should be dulled by abrading <br />the surface. Apply a test area, allowing paint to dry one week before testing <br />adhesion. If adhesion is poor, additional abrasion of the surface and/or removal of <br />the previous coating may be necessary. Retest surface for adhesion. If paint is <br />peeling or badly weathered, clean surface to sound substrate and treat as a new <br />surface as above. Recognize that any surface preparation short of total removal of <br />the old coating may compromise the service length of the system. <br />APPLICATION PROCEDURES <br />Apply paint at the recommended film thickness and spreading rate as indicated on <br />front page. Application of coating below minimum recommended spreading rate will <br />adversely affect coating performance. <br />SAFETY PRECAUTIONS <br />Refer to the SOS sheets before use. FOR PROFESSIONAL USE ONLY <br />Published technical data and instructions are subject to change without notice. <br />Contact your Sherwin-Williams representative for additional technical data and <br />instructions. <br />PERFORMANCE TIPS <br />No painting should be done immediately after a rain or during foggy weather. <br />When using spray application, use a 50% overlap with each pass of the gun to avoid <br />holidays, bare areas, and pinholes. Apply coating evenly while maintaining a wet <br />edge to prevent lapping. <br />Airless Spray <br />Pressure....................................2000 psi <br />Hose ............................................ 114" ID <br />Tip...................................... <br />Filter ......................................... 60 mesh <br />Reduction ..................Not recommended <br />Conventional Spray <br />Gun .......................................... <br />Binks 95 <br />Fluid Nozzle........................................66 <br />Air Nozzle ...................................... <br />63PB <br />Atomization Pressure ....................60 <br />psi <br />Fluid Pressure...............................25 <br />psi <br />ReductionAs needed up <br />to 5% by volume <br />Brush ........................... Nylon/Polyester <br />Reduction ..................Not recommended <br />Roller...................................3/8" woven <br />ReductionAs needed up to 5% by volume <br />If specific application equipment is listed above, <br />equivalent equipment may be substituted. <br />CLEANUP INFORMATION <br />Clean spills and spatters immediately with <br />soap and warm water. Clean hands and tools <br />immediately after use with soap and warm <br />water. After cleaning, Flush spray equipment <br />with compliant cleanup solvent to prevent <br />rusting of the equipment. Follow <br />manufacturer's safety recommendations when <br />using solvents. <br />HOTW 0911112015 B66WO0310 3296 <br />KOR, FRC, SP <br />The information and recommendations set forth in this Product Data Sheet are based upon tests conducted by or on behalf of The Sherwin-Williams Company. Such <br />information and recommendations set forth herein are subject to change and pertain to the product offered at the time of publication. Consult your Sherwin-Williams <br />representative or visit www.p.iintdocs.com to obtain the most current version of the PDS and/or an SIDS. <br />5of31 <br />