Laserfiche WebLink
• <br />BODIES - GARBAGE DEPARTMENT <br />EDWARDS TRAILER & BODY CO. A Non -Collusion Affidavit <br />SOUTH BEND, INDIANA. and Certified Check in the <br />amount of $1200.00 accom- <br />panied the Bid. <br />3 - Gar Wood Load Packer Refuse Units <br />Model LP-210, 10 cu. yd. capacity <br />as perspecifications in proposal <br />Delivery f.o.b. Detroit,Mich. @$3844.50 $11,533.50 <br />Alternate Bid <br />3 - Gar Wood Load Packer Refuse Units, <br />Model LP-210, 10 cu. ydcapacity <br />as per specifications in proposal <br />delivery f.o.b. Detroit,Mich. @ $3897.65 $11,692.95 <br />LEACH COMPANY A Non -Collusion Affidavit <br />OSHKOSH, WISCONSIN And Bid Bond in the amount <br />of $1300.00 accompanied <br />the Bid. <br />3 - 9 cu. yd. Leach PACKMASTER, in <br />accordance with manufacturerts <br />specifications @ $3756.25 ---- --- $11,268.75 <br />Delivery approximately 5 days after <br />receipt of order. <br />The above bids were taken under advisement for tabulation and report. <br />The Board next examined a petition bearing sixty-one signatures, asking for <br />"One Side Parking" signs on West Calvert Street, from Franklin Street to Kemble Avenue, <br />and the elimination of heavy trucking on this section of Calvert Street. Petition was <br />referred to Traffic Engineer, E. H. Miller for investigation and report. <br />The installation of S-T-O-P signs was approved by the Board for the following <br />locations: <br />Marquette Boulevard at Wilbur Street <br />Washington Avenue at Kaley Street <br />Prast Boulevard at the intersection <br />of Ardmore Trail and Sheridan Street. <br />A price change schedule from the South Bend Parking Company, Inc., under date of <br />August 14, 1953, was examined and ordered filed. <br />Excavator's Bonds, each in the sum of $1,000.00, were examined and approved by <br />the Board for Bernard B. Bartell, and for the Midland Engineering Company, Inc. <br />Contractorts Bonds, each in the sum of $1,000.00, were examined and approved by <br />the Board for the following contractors: <br />Harry W. Dille W. R. Shaffer <br />Russell Rose, Sr. Eddie Ward. <br />There being no further business to come before the Board, the meeting was adjourned <br />at 11:30 A. M. <br />Attest: <br />Clerk <br />