My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - New Traffic Signal System at Intersection of Sample and Sheridan
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - DLZ Indiana LLC - New Traffic Signal System at Intersection of Sample and Sheridan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:45:28 AM
Creation date
11/16/2017 11:19:09 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is Exhibit C, consisting of 4 pages, <br />referred to in and part of the Short Form of <br />Agreement between Owner and Engineer for <br />Professional Services dated , <br />Payment to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — Lump Sum and Standard <br />Hourly Rates <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) - <br />Lump Sum and Standard Hourly Rates Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for <br />services of Engineer's Resident Representative, if any, as follows: <br />1. Design and Right of Way Services amount not to exceed $36,200.00, based <br />on the following distribution of compensation: <br />Item <br />Description <br />Amount <br />Type <br />a. <br />Traffic Study/Evaluation <br />$2,900.00 <br />Lump Sum <br />b. <br />Pick -Up Topographic Survey <br />$2,400.00 <br />Lump Sum <br />C. <br />Traffic Signal Design and Plans <br />$20,900.00 <br />Lump Sum <br />and Roadway Design and Plans <br />d <br />Traffic Signal Timing and <br />$1,500.00 <br />Lump Sum <br />Optimization <br />e. <br />Utility Coordination <br />$4,500.00 <br />Hourly Rate <br />Bid, Pre -Construction Meeting, <br />f. <br />Shop Drawing Review and <br />$4,000.00 <br />Hourly Rate <br />Construction Phase Services <br />Total Not -to -Exceed Amount <br />$36,200.00 <br />2. Engineer may alter the distribution of compensation between individual <br />phases noted herein to be consistent with services actually rendered, but <br />shall not exceed the total Lump Sum amount unless approved in writing by <br />the Owner. <br />Exhibit C, Project Fee Schedule <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright ©2009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.