My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Design and Right of Way for Tucker Drive
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Design and Right of Way for Tucker Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:45:03 AM
Creation date
11/16/2017 11:16:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is Exhibit C, consisting of 4-pages, <br />referred to in and part of the Short Form of <br />Agreement between Owner and Engineer for <br />Professional Services dated , 2017. <br />Payment to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — Lump Sum and Standard <br />Hourly Rates <br />Article 2 of the Agreement is supplemented to include the following agreement of the <br />parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2. 01 Compensation for Basic Services (other than Resident Project Representative) - <br />Lump Sum and Standard Hourly Rates Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for <br />services of Engineer's Resident Representative, if any, as follows: <br />Design and Right of Way Services amount not to exceed $27,300.00, based <br />on the following distribution of compensation: <br />Item <br />Description <br />Amount <br />Type <br />a. <br />Design plans and contract bid documents <br />$18,000.00 <br />Lump Sum <br />b. <br />Utility Coordination <br />$2,000.00 <br />Hourly Rate <br />C. <br />Right of Way Services <br />$3,800.00 <br />Lump Sum <br />d' <br />Bid, Pre -Con Meeting and Construction <br />Phase Services <br />$3,500.00 <br />Hourly Rate <br />Total <br />$27,300.00 <br />2. Engineer may alter the distribution of compensation between individual <br />phases noted herein to be consistent with services actually rendered, but <br />Exhibit C, Compensation and Hourly hates Schedule <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright b2009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Paget 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.