Laserfiche WebLink
■ <br />• ' _ lwam <br />_�sr�rsrsree <br />• <br />The Pwit Constr-Hetion Phase <br />during the <br />Gonstr-Hetion Phase if <br />sen4lees may leommenee <br />and, not <br />other -wise modified -a this Exhibit <br />A, will ter-m-nate twelve months <br />after- the eammeneement of tke <br />PART 2 — ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Oivner's Written Authorization <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional <br />Services of the types listed below. <br />1. Arc Flash Assessment and Review <br />a. The Wastewater Treatment Plant has recently implemented the City's Are Flash Safety <br />Program for staff and contractors, and applied are flash labels to the electrical panels <br />such that authorized personnel may access panels with the correct personal protective <br />equipment (PPE). Engineer will utilize the City's Arc Flash Safety Program to review <br />the current Are Flash rating for up to eight power systems associated with the WWTP <br />building and process areas and will provide updated information that meets the program <br />requirements. The information can be summarized in the Electrical Evaluation Report <br />or in a separate technical memorandum. <br />2. Additional meetings, workshops, or presentations with the Owner other than those listed <br />herein. <br />Page 11 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EdCDC. All rights reserved. <br />