My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Arcadis US - WWTP Stress Testing Evaluation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - Arcadis US - WWTP Stress Testing Evaluation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:37:52 AM
Creation date
11/16/2017 11:04:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
31. Supplier - A manufacturer, fabricator, supplier, distributor, materialman, or vendor <br />having a direct contract with Contractor or with any Subcontractor to furnish materials or <br />equipment to be incorporated in the Work by Contractor or Subcontractor. <br />32. Total Project Costs - The sum of the Construction Cost, allowances for contingencies, <br />and the total costs of services of Engineer or other design professionals and consultants, <br />together with such other Project -related costs that Owner furnishes for inclusion, <br />including but not limited to cost of land, rights -of -way, compensation for damages to <br />properties, Owner's costs for legal, accounting, insurance counseling and auditing <br />services, interest and financing charges incurred in connection with the Project, and the <br />cost of other services to be provided by others to Owner pursuant to Exhibit B of this <br />Agreement. <br />33. Work The entire construction or the various separately identifiable parts thereof required <br />to be provided under the Contract Documents. Work includes and is the result of <br />performing or providing all labor, services, and documentation necessary to produce such <br />construction, and furnishing, installing, and incorporating all materials and equipment into <br />such construction, all as required by the Contract Documents. <br />ARTICLE 8 - EXHIBITS AND SPECIAL PROVISIONS <br />8.01 Exhibits Included: <br />A. Exhibit A, Engineer's Services. <br />B. Exhibit B, Owner's Responsibilities. <br />C. Exhibit C, Payments to Engineer for Services and Reimbursable Expenses. <br />tentative NOT INCLUDED <br />E. 14*1 ibit - Noti e f A „eeptabifit . ,,f Work NOT INCLUDED <br />F. Exhibit F, Genstmetion Cost .NOT INCLUDED <br />G. Exhibit G, Insurance. <br />. NOT INCLUDED <br />I. Exhibit 1, Limitations of Liability. <br />d. Exhibit j, Speeial Pr visiens. NOT INCLUDED <br />K. Exhibit KArendfnei# to Owner- -Eri reef Agreement. NOT INCLUDED <br />8.02 Total Agreement: <br />A. This Agreement, (together with the exhibits identified above) constitutes the entire agreement <br />between Owner and Engineer and supersedes all prior written or oral understandings. This <br />Page 15 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.