My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - 2017 Engineering Remodel No 117-116 - Brown & Brown General Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - 2017 Engineering Remodel No 117-116 - Brown & Brown General Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:26:54 PM
Creation date
11/16/2017 10:46:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />C T ACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: <br />PROJECT NO. <br />QUOTES DUE <br />2017 Engineering Remodel <br />117-116 <br />November 14, 2017 <br />(Must be completed for all quotes. Please type or print) <br />Date: November 14, 2017 Firm: Brown & Brown General Contractors, Inc. <br />Address: 124 S. Elkhart St., PO Box 487 <br />City/State/Zip <br />Wakarusa, IN 46573 <br />Telephone Number: (574) 862-2171 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />2017 Engineering Remodel <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated ] for the sum of (enter the Total Quote as shown on the Proposal) <br />Twelve thousand four hundred eight and 00/100 ($ 12,408.00 <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachm <br />By <br />(Sig al ire) <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />Eric Brawn, President <br />(printed Name of Person Signing) <br />ACCEPTANCE <br />day of <br />Suzanna M. Fritzberg, Member <br />Therese J. Dorau, Member <br />20 <br />Version 10/18/2016 Page - 1 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.