Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Farmington Lift Station 14A Rehabilitation <br />Project No. <br />For Bids Due <br />BASE BID <br />117-027 <br />November 14, 2017 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization and Demobilization <br />1 <br />LS(,La#.L� <br />2 <br />Maintaining Traffic <br />1 <br />LS <br />,, < <br />3 <br />Clearing Right of Way <br />1 <br />LS <br />4 <br />Construction Engineering <br />1 <br />LS <br />J 000.vv,Ov0.(go <br />5 <br />Temporary Erosion and Sediment <br />Control, <br />1 <br />LS <br />Coo, Dt): <br />OoO, <br />6 <br />Bypass Pumping <br />1 <br />LS <br />35, tbv.vn5, <br />vuca. oo <br />7 <br />Curb and Gutter, Type `A' <br />20 <br />LFT <br />! ou, as <br />, oUF�: aU <br />8 <br />Compacted Aggregate, No. 53, Base <br />50 <br />TON <br />30,00 <br />1, Soo, 00 <br />9 <br />Asphalt Pavement Patching <br />15 <br />SYD <br />jq, o� <br />�I , 7�?S, o0 <br />10 <br />PCCP for Drive, 6" <br />15 <br />SYD <br />1 , pp <br />f, �� , Dc�) <br />11 <br />Top Soil <br />15 <br />CYS <br />/a?�,Do <br />i�d'7 vo <br />12 <br />Sodding, Nursery <br />70 <br />SYD <br />Jd, � <br />-735, oo <br />13 <br />Force Main, 4" Dia, <br />50 <br />LFT <br />��, pp <br />f, DUo. o0 <br />14 <br />Force Main, 6" Dia. <br />15 <br />LFT <br />30,06 <br />�ISo.• op <br />15 <br />Temporary Shoring Walls <br />1 <br />LS <br />' po0 po <br />6,, or0> oD <br />16 <br />Lift Station <br />1 <br />LS <br />�Q8 Doc,. c>o <br />d7 �&', 000 .o» <br />17 <br />Lift Station Electrical <br />1 <br />LS <br />18 <br />Tree, Decidous,2" Cal. <br />1 <br />EA <br />op <br />19 <br />Shrub, 3-Gal. Cont. <br />6 <br />EA <br />-7, , oa <br />ySCj, oa <br />20 <br />Shrub, 18", B&B <br />6 <br />EA <br />170, DO <br />%, 0-40, pa <br />21 <br />Shredded Hardwood Mulch <br />5 <br />CYS <br />'7-5, Dp <br />3 Is ov <br />22 <br />Weed Barrier Fabric <br />30 <br />SYD,k� <br />23 <br />Debris Removal Allowance <br />200 <br />TONS <br />24 <br />Utility Relocation Allowance <br />1 <br />LS <br />$10,000.00 <br />$10,000.00 <br />BASE BID TOTAL' 7 q, p(ac5e Leo <br />Bidder (Firm): <br />HRP CONSTRUCTION INC. <br />Version 8/22/2017 Contractor's Bid for Public Works - 7 <br />