Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name 100 Wayne Street Plaza and Streetscape <br />Project No. <br />For Bids Due <br />BASE BID <br />116-047R <br />November 14, 2017 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization /Demobilization <br />1 <br />LSum <br />$12,734.00 <br />$12,734.0 <br />All Work in the Plaza Zone <br />2 <br />Construction Engineering <br />1 <br />LSum <br />$8,390.00 <br />$8,390.0 <br />3 <br />Concrete Sidewalk Removal <br />318 <br />SYS <br />$36.35 <br />$11,559.3 <br />4 <br />Temporary Inlet Protection <br />2 <br />LSum <br />$250.0 <br />$500.0 <br />5 <br />Maintenance of SidewalkTraffic <br />1 <br />LSum <br />$4,541.24 <br />$4,541.2 <br />6 <br />Concrete Ramp Replacement <br />20 <br />SYS <br />$145.00 <br />$2,900.0 <br />7 <br />Plaza Specialty Paving <br />266 <br />SYS <br />$212.22 <br />$56,450.52 <br />8 <br />Washed Sand Setting Bed, %" <br />2 <br />CYS <br />$1,310.00 <br />$2,620.0 <br />9 <br />#12 Aggregate Base, 1'/2" <br />11 <br />CYS <br />$507.64 <br />$5,584.0 <br />10 <br />Geotextile Fabric <br />266 <br />SYS <br />$3.4 <br />$904.4 <br />11 <br />Concrete Steps Replacement <br />32 <br />SYS <br />$1,200.00 <br />$38,400.0 <br />12 <br />Top Sol[ Planters <br />13 <br />CYS <br />$76.50 <br />$994.5 <br />13 <br />Mulch <br />5 <br />CYS <br />$100.00 <br />$500.0 <br />14 <br />Trees, Ornamental <br />6 <br />Ea. <br />$450.00 <br />$2,700.0 <br />15 <br />Perennials <br />64 <br />Ea. <br />$32.00 <br />$2,048.0 <br />16 <br />Liriope / Bulbs <br />116 <br />Ea. <br />$12.00 <br />$1,392.0 <br />BASE BID TOTAL 15� 2 218.,-00 <br />ALTERNATES <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />17 <br />Alt. #1 - Plaza Waterproof Membrane <br />265 <br />SYS <br />$71.33 <br />$18,902.45 <br />Alt. #2 - All Work in the Streetscape Zone <br />18 <br />Construction Engineering <br />1 <br />LSum <br />$1,692.50 <br />$1,692.5 <br />19 <br />Concrete and Paver Removal <br />420 <br />SYS <br />$23.50 <br />$9,870.0 <br />20 <br />Curb, Flush, Concrete <br />10 <br />LF <br />$214.00 <br />$2,140.0 <br />21 <br />Curb Ramp, Concrete <br />2 <br />SYS <br />$3,033.00 <br />$6,066.0 <br />22 <br />Concrete Sidewalk Replacement <br />380 <br />SYS <br />$84.00 <br />$31,920.0 <br />Version 10/17/2016 Contractor's Bid for Public Works - 8 <br />