City of South Bend Project No. 116-066 <br />Change Order No. 1—11/9117 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Kara M. Boyles, P.E. <br />Professional Engineer No. 10809510 <br />CONTRACTOR: Gibson -Lewis, LLC. <br />PROJECT: Fire Station #4 <br />Project No. 116-066 <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: November 9, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item <br />Qtv <br />Unit <br />Price <br />Days <br />Total <br />1. New CurblWalk/Path <br />1 <br />LS <br />$129,224.00 <br />15 <br />$129,224.00 <br />2. Tapered Roof Insulation <br />1 <br />LS <br />$2,617.00 <br />0 <br />$2,617.00 <br />3. Temporary Basin <br />1 <br />LS <br />$12,831.00 <br />12 <br />$12,831.00 <br />4. Storm Doors <br />1 <br />LS <br />$5,470.00 <br />0 <br />$5,470.00 <br />Net Chancre Order Amount $150,142.00 <br />1) New CurbMalk/Path: New curbing and sidewalks will be installed around the site. An <br />asphalt path way will also be installed as part of the new building. This includes all removals of <br />existing materials. <br />2) Tapered Roof Insulation: Tapered roof insulation is needed to completely insulate the <br />sloped roof areas. <br />3) Temporary Basin: A temporary storm water basin needs to be installed to collect storm <br />water until the dedicated basin can be installed. The dedicated basin cannot be installed until <br />the demolition of the existing building is complete. <br />4) Storm Doors: Garage -style storm doors will be installed on the exterior wall of the second <br />floor balcony. This will reduce the risk of weather damage to mechanical and electrical system <br />beneath the balcony. <br />