My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Gibson Lewis LLC - Fire Station No 4 Project No 116-066
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No 1 - Gibson Lewis LLC - Fire Station No 4 Project No 116-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:32:19 PM
Creation date
11/16/2017 9:46:23 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 116-066 <br />Change Order No. 1—11/9117 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Kara M. Boyles, P.E. <br />Professional Engineer No. 10809510 <br />CONTRACTOR: Gibson -Lewis, LLC. <br />PROJECT: Fire Station #4 <br />Project No. 116-066 <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: November 9, 2017 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item <br />Qtv <br />Unit <br />Price <br />Days <br />Total <br />1. New CurblWalk/Path <br />1 <br />LS <br />$129,224.00 <br />15 <br />$129,224.00 <br />2. Tapered Roof Insulation <br />1 <br />LS <br />$2,617.00 <br />0 <br />$2,617.00 <br />3. Temporary Basin <br />1 <br />LS <br />$12,831.00 <br />12 <br />$12,831.00 <br />4. Storm Doors <br />1 <br />LS <br />$5,470.00 <br />0 <br />$5,470.00 <br />Net Chancre Order Amount $150,142.00 <br />1) New CurbMalk/Path: New curbing and sidewalks will be installed around the site. An <br />asphalt path way will also be installed as part of the new building. This includes all removals of <br />existing materials. <br />2) Tapered Roof Insulation: Tapered roof insulation is needed to completely insulate the <br />sloped roof areas. <br />3) Temporary Basin: A temporary storm water basin needs to be installed to collect storm <br />water until the dedicated basin can be installed. The dedicated basin cannot be installed until <br />the demolition of the existing building is complete. <br />4) Storm Doors: Garage -style storm doors will be installed on the exterior wall of the second <br />floor balcony. This will reduce the risk of weather damage to mechanical and electrical system <br />beneath the balcony. <br />
The URL can be used to link to this page
Your browser does not support the video tag.