Laserfiche WebLink
Bulletin No. 1: <br />2016 Parking Garage Improvements <br />South Bend, Indiana <br />BULLETIN DESCRIPTION: <br />Omit the through -wall air conditioning units from the Leighton Plaza Parking Structure and add split <br />systems. <br />DRAWINGS: <br />Item #1: Leighton. Plaza Stair Tower I <br />Sheet: 3 of 5 (Reissued) <br />A. Omit the two -ton through -wall air conditioning unit. <br />B. Add infill of the wall opening left by the removal of the existing through -wall air <br />conditioner with 3" insulated metal panel. The color of the exterior face is to match the <br />surrounding wall. Install sealant around the entire perimeter. The interior face of the <br />opening is to be finished with fiberglass faced gypsum board to match the surrounding <br />wall. <br />C. Add AC -I and CU-1. <br />D. Add a new 20A, 2 pole circuit breaker in existing Panel `RPI' for the new CU-1 and <br />AC-1. <br />E. Add a new 30A, 2 pole, NEMA 4 fusible safety switch for the new AC-1. <br />F. Add a new 30A, 2 pole, NEMA 4 fusible safety switch for CU-1. <br />Sheet: 5 of 5 (Reissued) <br />G. Add "Leighton" to Location column of Air Conditioning Split System schedule. <br />Item #2: Leighton Plaza Stair Tower 2 <br />Sheet: 4 of 5 (Reissued) <br />A. Omit the two -ton through -wall air conditioning unit. <br />B. Add infill of the wall opening left by the removal of the existing through -wall air <br />conditioner with 3" insulated metal panel. The color of the exterior- face is to match the <br />surrounding wall. Install sealant around the entire perimeter. The interior face of the <br />opening is to be finished with fiberglass faced gypsum board to match the surrounding <br />wall. <br />C. Add AC-1 and CU-1. <br />D. Add a new 20A, 2 pole circuit breaker in existing Panel `RPI' for the new CU-1 and <br />AC-1. <br />E. Add anew 30A, 2 pole, NEMA 4 fusible safety switch for the new AC-1. <br />F. Add a new 30A, 2 pole, NEMA 4 fusible safety switch for CU-1. <br />Sheet: 5 of 5 (Reissued) <br />G. Add "Leighton" to Location column of Air Conditioning Split System schedule. <br />End of Bulletin No. 1 <br />Page 2 of 2 <br />Byee & Associates, Inc. <br />