Laserfiche WebLink
QUOTEIPROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Fellows Street Raised Crosswalk <br />PROJECT NO. 117-086 <br />QUOTES DUE October 24, 2017 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Maintaining Traffic <br />1 <br />LSUM <br />$3,002.00 <br />$ 3,002.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LSUM <br />$4,860.00 <br />$ 4,860.00 <br />3 <br />Construction Engineering <br />1 <br />LSUM <br />$2,891.00 <br />$ 2,891.00 <br />4 <br />Clearing Right -of -Way <br />1 <br />LSUM <br />$9,890.50 <br />$ 9,890.50 <br />5 <br />Temporary Erosion and Sediment <br />Control <br />1 <br />LSUM <br />$1,900.50 <br />$1,900.50 <br />6 <br />Compacted Aggregate, No. 53, <br />Base <br />46 <br />TON <br />$70.00 <br />$ 3,220.00 <br />7 <br />Milling, Profile <br />345 <br />SYS <br />$16.00 <br />$ 5,520.00 <br />8 <br />HMA Surface, Type B, 9.5 mm <br />30 <br />TON <br />$196.00 <br />$ 5,880.00 <br />9 <br />Raised Crosswalk, Concrete, <br />12-in. Min. <br />114 <br />SYS <br />$317.50 <br />$ 36,195.00 <br />10 <br />Patch, Concrete, 8-in. <br />23 <br />SYS <br />$94.50 <br />$ 2,173.50 <br />11 <br />Sidewalk, Concrete, 4-in. <br />114 <br />SYS <br />$48.00 <br />$ 5,472.00 <br />12 <br />Curb Ramp, Concrete, 6-in. <br />13 <br />SYS <br />$215.50 <br />$ 2,801.50 <br />13 <br />Curb, Concrete, 6-in. <br />101 <br />LIFT <br />$33,00 <br />$ 3,333.00 <br />14 <br />PCCP for Approaches, 9-in. <br />23 <br />SYS <br />$96.00 <br />$ 2,208,00 <br />15 <br />Nursery Sodding <br />121 <br />SYS <br />$18.50 <br />$ 2,238.50 <br />16 <br />Plant, Deciduous Tree, Single <br />Stem, 2-in. <br />1 <br />EACH <br />$550.00 <br />$ 550.00 <br />17 <br />Sign, Sheet, 0.080", with Legend <br />34 <br />SFT <br />$20.00 <br />$ 680.00 <br />18 <br />Pavement Message Marking, <br />Preformed Plastic, Nested <br />Chevrons, Grooved <br />2 <br />EACH <br />$1,500.00 <br />$3,000.00 <br />19 <br />Line, Thermoplastic, Solid, <br />Yellow, 4-in. <br />311 <br />LIFT <br />$5.00 <br />$1,555.00 <br />Total Amount of Quote <br />$ 97,370.50 <br />Version 10/18/2016 Page -17 Public Works Quote <br />