QUOTEIPROPOSAL
<br />CITY OF SOUTH BEND
<br />PROJECT NAME Fellows Street Raised Crosswalk
<br />PROJECT NO. 117-086
<br />QUOTES DUE October 24, 2017
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Maintaining Traffic
<br />1
<br />LSUM
<br />$3,002.00
<br />$ 3,002.00
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LSUM
<br />$4,860.00
<br />$ 4,860.00
<br />3
<br />Construction Engineering
<br />1
<br />LSUM
<br />$2,891.00
<br />$ 2,891.00
<br />4
<br />Clearing Right -of -Way
<br />1
<br />LSUM
<br />$9,890.50
<br />$ 9,890.50
<br />5
<br />Temporary Erosion and Sediment
<br />Control
<br />1
<br />LSUM
<br />$1,900.50
<br />$1,900.50
<br />6
<br />Compacted Aggregate, No. 53,
<br />Base
<br />46
<br />TON
<br />$70.00
<br />$ 3,220.00
<br />7
<br />Milling, Profile
<br />345
<br />SYS
<br />$16.00
<br />$ 5,520.00
<br />8
<br />HMA Surface, Type B, 9.5 mm
<br />30
<br />TON
<br />$196.00
<br />$ 5,880.00
<br />9
<br />Raised Crosswalk, Concrete,
<br />12-in. Min.
<br />114
<br />SYS
<br />$317.50
<br />$ 36,195.00
<br />10
<br />Patch, Concrete, 8-in.
<br />23
<br />SYS
<br />$94.50
<br />$ 2,173.50
<br />11
<br />Sidewalk, Concrete, 4-in.
<br />114
<br />SYS
<br />$48.00
<br />$ 5,472.00
<br />12
<br />Curb Ramp, Concrete, 6-in.
<br />13
<br />SYS
<br />$215.50
<br />$ 2,801.50
<br />13
<br />Curb, Concrete, 6-in.
<br />101
<br />LIFT
<br />$33,00
<br />$ 3,333.00
<br />14
<br />PCCP for Approaches, 9-in.
<br />23
<br />SYS
<br />$96.00
<br />$ 2,208,00
<br />15
<br />Nursery Sodding
<br />121
<br />SYS
<br />$18.50
<br />$ 2,238.50
<br />16
<br />Plant, Deciduous Tree, Single
<br />Stem, 2-in.
<br />1
<br />EACH
<br />$550.00
<br />$ 550.00
<br />17
<br />Sign, Sheet, 0.080", with Legend
<br />34
<br />SFT
<br />$20.00
<br />$ 680.00
<br />18
<br />Pavement Message Marking,
<br />Preformed Plastic, Nested
<br />Chevrons, Grooved
<br />2
<br />EACH
<br />$1,500.00
<br />$3,000.00
<br />19
<br />Line, Thermoplastic, Solid,
<br />Yellow, 4-in.
<br />311
<br />LIFT
<br />$5.00
<br />$1,555.00
<br />Total Amount of Quote
<br />$ 97,370.50
<br />Version 10/18/2016 Page -17 Public Works Quote
<br />
|