My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to Professional Services Agreement - Lawson-Fisher Assoc. - SB Dam Underwater Inspection and Survey
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Amendment to Professional Services Agreement - Lawson-Fisher Assoc. - SB Dam Underwater Inspection and Survey
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 4:13:26 PM
Creation date
11/16/2017 9:37:54 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LFA Project File 9030.46 <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated July 12, 2016. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 2 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: July 12, 2016 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />c. Engineer: Lawson -Fisher Associates P.C. <br />d. Project: South Bend Dam Underwater Inspection and Bathymetric Survey <br />City Project No. 116-071 <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />In addition to the contracted Scope of Work for the South Bend Dam Underwater <br />Inspection and Bathymetric Survey and subsequent amendments, LFA will prepare <br />the following: <br />1. Prepare a Public Safety Plan (PSP) for the project to be submitted to the <br />Federal Energy Regulatory Conu-nission (FERC). This fan will be prepared <br />per the FERC requirements. <br />2. Prepare an emergency contact list per the requirements noted in the June 9, <br />2017 FERC letter. <br />3. Prepare a memorandum discussing the status and plan for the West Race <br />Headgate Project that is currently in progress. This memorandum will be <br />prepared so that it can be submitted to the FERC to provide an update for <br />the project. <br />b. For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />$4,000.00 <br />C. The schedule for rendering services is modified as follows: <br />0 Completion of the above items and submittal to the City by December 8, 2017. <br />3. Agreement Summary (Reference only) <br />Page 1 <br />(Exhibit K -- (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.