Laserfiche WebLink
553 <br />i <br />L� <br />• <br />• <br />C. D. Smelser Bid continued - <br />Specification for 6-F Gravel'(at least 49% <br />crushed material)'in stockpile - if cubical <br />content has been previously determined -------- $1.15 <br />C. D. Smelser Co., <br />South Bend, Indiana <br />Washed Concrete Sand loaded into <br />your trucks <br />"Washed Mortar Sand loaded into <br />your trucks <br />Washed Asphalt Sand loaded into <br />your trucks <br />#12 Gravel, Indiana State Highway <br />Spec if is at ions <br />#12 Washed Rice Gravel, same quality <br />and approvimately same quantity as <br />furnished you in 1952 loaded into <br />your trucks <br />South Bend Sand & Gravel Corp., <br />South Bend, Indiana <br />Ton Washed Mortar Sand - F.O.B. Plant <br />A Non -Collusion Affidavit <br />and Certified Check for <br />$500.00 accompanied the Bid <br />$1.00 per ton <br />y1.00 per ton <br />.60 per ton <br />$1.00 per ton <br />.80 per ton <br />A Non -Collusion Affidavit <br />and Bid Bond accompanied <br />the bid. <br />$1.00 <br />Ton Washed Concrete Sand - F.O.B. Plant $1.00 <br />Ton Washed Rice Gravel - F.O.B. Plant <br />Materials to be loaded by vendor. <br />Kuert Concrete, Inc., <br />South Bend, Indiana. <br />Ready mixed concrete in following <br />strengths, using local gravel as the <br />coarse aggregate: <br />CD <br />Yd. 2500# - FOB Plant per cubic yard <br />Yd. 3000# - FOB Plant per cubic yard <br />Yd. 3500# - FOB Plant per cubic yard <br />$1.00 <br />A Non -Collusion Affidavit <br />and Bid Bond accompanied <br />the bid. <br />$6.55 <br />8.95 <br />9.55 <br />Ready mixed concrete in following strengths <br />using crushed limestone as the coarse <br />aggregate: <br />Yd. <br />2500# <br />FOB <br />Plant <br />- per <br />cubic <br />yard <br />$9.90 <br />Yd. <br />3000# <br />FOB <br />Plant <br />- per <br />cubic <br />yard <br />10.30 <br />Yd. <br />3500# <br />FOB <br />Plant <br />- per <br />cubic <br />yard <br />10.90 <br />Add 50X per cubic yard for 20/'o' Calcium <br />Chloride added when required by job. <br />:: Local Gravel does not meet State Specifications. <br />Western Indiana Gravel Co., <br />LaFayette, Indiana. <br />5000 cubic yards or less <br />Washed sand for concrete and mortar <br />5 L Gravel <br />Simon Brothers, Inc., <br />South Bend, Indiana <br />500 Tons No. l Rock Salt <br />packed in 100# bags <br />delivered to the Street Dept. <br />A Non -Collusion Affidavit <br />and Bid Bond accompanied <br />the bid. <br />f.o.b. trucks at our <br />South Bend plant. <br />Y .90 per ton <br />$1.35 per ton <br />A Non -Collusion Affidavit <br />and Certified Check in <br />the amount of 01140.00 <br />accompanied the bid. <br />$22.60 per ton. <br />