My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/26/1951 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1951
>
12/26/1951 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 9:41:46 AM
Creation date
11/2/2017 12:05:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/26/1951
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7 <br />0 <br />9 <br />1 ] <br />0 <br />• <br />TRAFFIC ENGINEERING DEPARTMENT. Ernest Miller, Traffic Engineer, was present and matter <br />pertaining to his department were discussed. <br />BUSSES: A petition was filed by Northern Indiana Transit, Inc., petitioning for a chang <br />in bus fares. This was ordered placed -on file, no action was taken. <br />TAXI CABS: A showing having been made to the Board that the Indiana Cab Co., the South <br />Bend Cab Co., and the Veteran's Cab Co., are controlled by the same share holders, per- <br />mission is now granted that the cab stand heretofore granted to the Veteran's Cab Co., <br />in front of Robertson Brothers Department Store may be used jointly by the Indiana Cab <br />Co., the South Bend Cab Co., -and the Veteran's Cab Company. <br />ENGINEERING DEPARTMENT: An Excavation Bond was approved and ordered filed for 0. J. <br />Shoemaker. <br />Contractorst Bonds were approved and ordered filed for Casimier Jerzakowski; Anthon <br />Kujawski & Son; John Franklin Lineback & Son; Harry Nicodemus Inc.; Anthony Swiatowy an <br />George W. Schwind d/b/a United Heating and Plumbing Company; and Tony Szymkowiak. <br />The Board rejected both bids received for steel scrap streetcar rails, inasmuch as <br />legal requirements were not complied with. <br />A petition was received from the Harry D. Ullery Coal Company asking for the vaca- <br />tion of a portion of an alley between Lots #339 and #345 in Cottrell's First Addition <br />to the town of Lowell. This was referred to the City Plan Commission. <br />STREET DEPARTMENT: Melton 0. Brannan, Street Commissioner, was present and ma tters per- <br />taining to his department were discussed. <br />CEMETERY DEPARTMENT: Stanley Leszczynski, Sexton, was present and matters pertaining to <br />his department were discussed. <br />There being no further business to come before the Board, the meeting was adjourned <br />at 11:00 a.m. <br />ATTEST: <br />BOARD OF PU IC WORKS & SAFETY <br />SPECIAL MEETING <br />December 26, 1951 <br />A Special Meeting of the Board of Public Works was held Friday, December 28, 1951" <br />at 2:30 p.m. All members were present. Also, present were Eugene Fattore, and Ralph <br />Moorehouse and Robert Schiller, representing Consoer, Townsend and Associates. The meet - <br />was called for the purpose of discussing the intercepting sewer projects. Disclosure <br />was made that through a mathematical error made in the March 1950 estimate.for Fattore <br />Company, the Fattore Company was overpaid for the amount of concrete used. The Fattore <br />Company has done some work in the joining of pipes which is not in the original contract <br />and which is to be included in a change order which will be approved when submitted along <br />with a statement from the contractor and approval by Consoer, Townsend and Associates. <br />The overpayment will be shown on the next estimate and will be credited at that time. <br />ATTEST: <br />10 <br />ffMML.0_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.