My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/01/1951 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1951
>
10/01/1951 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 9:44:45 AM
Creation date
11/2/2017 10:19:56 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/1/1951
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tj <br />0 <br />0 <br />• <br />• <br />0 <br />I CEMETERY DEPARTMENT: Stanley Leszczynski, Sexton, was present and matters pertaining <br />j to his department were discussed. <br />There being no further business to come before <br />at ll:00 a.m. <br />,,ATTEST: <br />I� <br />October 1, 1951 <br />the Board, the meeting was adjourned <br />BOARD OF FURLIC 1N0 5 8c SAFETY <br />A regular meeting of the Board of Public Works was held on Monday, October 1, 1951, <br />at 9:30 a.m. Mr. Baer was absent. Minutes of the previous meeting were read and approv. <br />ed. Salary claims in the amount of $23, 933.01 were approved and ordered paid. Claims <br />of the following suppliers in the amount of $4,720.16 were approved and ordered paid: <br />American Vetrified Products <br />American Vetrified Products <br />Fiwek Brothers <br />Haberle, John B. <br />Eckler Mfg. Co., Henry <br />Indiana Bell Telephone Co. <br />Indiana Bell Telephone Co. <br />Indiana & Michigan Electric <br />Lower Company, I. W. <br />McComb Battery Co. <br />Peltz-Kaufer Paper Co. <br />Schilling's <br />Schillingts <br />Schwarz Paper Cg. <br />South Bend Water Works <br />Trojan Tool Equipment <br />8.82 <br />147.00 <br />20.42 <br />14.00 <br />10.40 <br />13.85 <br />113.15 <br />.92 <br />186.00 <br />4.80 <br />39.30 <br />57.00 <br />7.63 <br />80.33 <br />44.61 <br />191.48 <br />Trojan Tool Equipment <br />188.28 <br />Trojan Tool Equipment <br />188.28 <br />STREET & TRAFFIC: <br />Continental Oil Co. <br />809.25 <br />Continental Oil Co. <br />1,507.80 <br />Continental Oil Co. <br />225,13 <br />Darnell Drugs Co. <br />3.72 <br />Harmon, V. E., M.D. <br />,20.00 <br />Indiana Bell Telephone Co. <br />9.19 <br />Kaylor Spring Co. <br />7.84 <br />Troeger, Andrew <br />11.32 <br />PARKING METER DEPARTMENT: <br />Dual Parking Meter 2.00 <br />Englewood Electrical Supply 758.45 11 <br />Indiana Bell Telephone Co. 9.19 <br />Vennet, Maurice 40,00 <br />TRAFFIC ENGINEERING DEPARTMENT: Ernest Miller, Traffic Engineer, <br />pertaining to his department were discussed. <br />was present and matters <br />Mr. Miller was granted permission to go to Indianapolis on October 2, 1951, to dis-' <br />cuss off-street parking with the State Committee and also to attend the Mid -West Safety <br />Conference in Chicago October 8, to.l2, inclusive. <br />A petition.was received asking for the elimination of heavy truck traffic on Dundee;` <br />Street. This was referred to Mr. Miller. <br />RAILROADS: A letter was received protesting the removal of railroad watchman at the <br />grade crossings at Western Avenue and Washington Avenue. A letter was sent to Mr. G. A. <br />Farabaugh, attorney for the New York Central Railroad asking that a representative of <br />the railroad be present at the next regular Board meeting Monday, October 8, 1951. <br />ENGINEERING DEPARTMENT: Contractors? Bonds were approved and ordered filed for Adams <br />Roofing & Construction Company; Melvin L. Green; Carl McClellan; and Kenneth F. Rose d/b/a <br />Red Rose Builder. <br />Permission was granted for the erection of a canopy across the sidewalk at the Firs <br />Presbyterian Church Saturday, October 6, 1951. <br />Sewer plans were approved by the Board in the McKinley Terrace Addition for the <br />Crown Development Company for Manchester Drive and Corby Street. <br />Mr. R. A. Smith representing Wilson Brothers appeared before the Board to discuss <br />the smoke nuisance. Mr. Smith assured the Board they were willing to cooperate in any <br />way possible and would have smoke arrestors placed on their buildings. <br />L. 0. Gates Chevrolet Corp., was granted permission to build certain driveways, <br />curbs and sidewalks along Western Avenue, Franklin and Wayne Streets for their new garag6. <br />One driveway entrance on Franklin Street will necessitate that trucks will have to back <br />up over the sidewalk. This permit is issued on the condition that each and every time <br />a delivery is made where the truck must back in over the walk, a man will be posted to <br />protect the pedestrian traffic at this driveway. <br />Mr. Harold Maurer and Mr. Roger Doust appeared before the Board to request permisW <br />sion to occupy a portion of the street in f ront of the National Bank Building during con;; <br />struction of a vault for the bank. It was the decision of the Board that permission for`:' <br />the above project be withheld until such time as the heavy traffic, due to football games <br />in South Bend, would be eliminated. Permission for such work will be granted about <br />November 26, 1951. <br />
The URL can be used to link to this page
Your browser does not support the video tag.