My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/02/1951 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1951
>
04/02/1951 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 9:53:49 AM
Creation date
11/1/2017 10:44:17 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/2/1951
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
251 <br />STREET DEPARTMENT., Melton Brannan, Street Commissioner, was present and matters pertain <br />ing to his Department were discussed. <br />An Equipment Rental Agreement for street sprinkler and flusher for flushing state, <br />maintained streets in South Bend was signed by, the, State Highway Commission and.returne <br />to the Board. This was placed on file. <br />j This being the. date set for receiving bias for one (1) Oil Fired Horizontal Type <br />' Tubular Sle°am Boiler for the Street Department, the following bids were 'opened and <br />• publicly read. - <br />Mr. Irving Baim A Non -Collusion Affidavit <br />1201 N. Allen St., with a Certified Check in <br />South ,Bend, Indiana -the amount of $558.30 accom- <br />panied the bid. <br />1 - Model <br />-4820AG Dutton Econotherm; automatically operated <br />oil fired .self-contained, packaged type steam generator <br />as per specifications - f.o.b. KalmazQo, Michigan $ 4,637.00 each <br />(net cost) <br />Above price includes starting and adjusting of the unit and <br />necessary service for 90 days from date of the startup provided <br />the unit is started within 6 months of delivery date. <br />Delivery can be made in approximately.5 weeks after order is <br />received and accepted at .the plant. <br />,EXTRAS: Streamlined Steel Enclosure Side Panels and Insulation $ 200.00 <br />Automatic jn�ater Feed Pump and Condensate System 546.00 <br />Protective sh&ild cover for oi.l burner 200.00 <br />TOTAL $ 5,583.00.. <br />• Reid -Holcomb Company, Inc., A Non -Collusion Affidavit <br />1815 Kentucky Ave., with a Bidder►s Bond in the <br />Indianapolis, Indiana amount of $4,500.00 accom- <br />panied the bid. <br />1 - Cleaver -Brooks Model DS-2 Two Car Tank <br />Car Heater, 28 Boiler Horsepower, con- <br />structed for operation at pressure up <br />j to 125# per square inch. Equipped per <br />i enclosed specifications. $ 2,795.00 <br />•I' The above unit is quoted f.o.b., South Bend, Indiana, and terms are net cash first meeting of Board after delivery. <br />• <br />• <br />0 <br />i <br />I Stockberger-Seastrom, Inc., <br />630 High St., <br />Fort Wayne, Indiana <br />i <br />1 - Model SG-26S Skid Mounted Portable Steam <br />Generator as per specifications <br />or <br />1 - Model SG-26T Portable Steam Generator <br />same as above except with Trailer Mounting <br />Extras if wanted <br />1 - 25 length and 2 - 15 Ft. Lengths or 3/4" <br />Flexible Bronze Steam dose & Unions <br />1 - 3/4" Standard Unit & Sediment Separator <br />1 - 1" Steam Valve for Outlet <br />The above bids were taken under advisement. <br />A Non -Collusion Affidavit <br />with a Contractor's Bond for <br />Supplies in the amount of <br />$350 accompanied the bid. <br />2,755.00 <br />2,910.00 <br />102.00 <br />42.00 <br />8.40 <br />CEMETERY DEPARTMENT: Stanley Leszczynski, Sexton, was present and matters pertaining to <br />his Department were discussed. <br />There being no further business to come before the Board, the meeting was adjourned <br />at 11:15 a.m. <br />ATTEST: <br />I <br />_�`'7 -`-` <br />BOAR PUBLIC ORKS �&.SAFrETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.