215
<br />j Mr. Miller informed the Board that stop signs have been installed to make four-way
<br />I stops on Walnut- at LaPorte Avenue and on � ffalnut at Dunham Street.
<br />i
<br />I Mr. Miller and his assistant, Frank Vukovits, were authorized to attend a Traffic
<br />(Safety Conference at Purdue University November 21, 1950.
<br />BUSSES: A letter was received from Northern Indiana Transit, Incorporated, relative to
<br />1!7 complaint referred to them November 13, 1950. The informed the Board that they would
<br />(investigate the conditions which brought about this complaint and gave assurance that
<br />• they will keep in close touch with the conditions as reported, and will take such steps
<br />as are possible in each. instance.
<br />i
<br />ENGINEERING DEPARTMENT: Contractors' Bonds were approved and ordered filed for Thomas
<br />(Darr, Russell B. Freese and Gino Vannoni & Sons Construction.
<br />i
<br />Certificates of Insurance were filed by John Gohr for the Niles Excavating Company.
<br />{
<br />VACATION RESOLUTION NO. 2658
<br />This being the date set for hearing on assessment roll of l acatioine of the6 8, the
<br />east
<br />alley south of Fredrickson Street from 0'Brien Str
<br />• �of O'Brien Street, the hearing was continued until December 41 1950.
<br />RESOLUTION ADOPTING FINAL ASSESSPIENT ROLLS
<br />Nos. 2634, 2638 and 2652
<br />I� South Bend, Indiana
<br />- November 2G, 195
<br />�Be It Resolved, By the Board of Public Works and Safety- of the City of South Bend, India
<br />na,e that the Primary or Preliminary Assessment Rolls adopted by the Board on the 6th day
<br />of November, 1950, for the improvements of ALLEYS BETWEEN SCOTT, TAYLOR, DONALD AND CAL-
<br />VERT STREETS, and No. 2638, KENDALL STREET PAVEMENT From the south lineof Calvert Street
<br />• to the north line of Donald Street, AND No. 2652, KENDALL STREET PAVEMENT from the north
<br />dine of Donald Street to the north line of Ewing Avenue, be and the same is in all thing
<br />confirmed.
<br />^ (Signed) R . S . Andry s i ak
<br />Frank J. Bruggner
<br />° F. K. Baer
<br />I� Freels G. Noble, Clerk BOARD OF PUBLIC WORKS & SAFETY
<br />CONTRACTORS COMPIE TION AFFIDAVIT
<br />I8TATE OF INDIANA )
<br />) SS:
<br />ST. JOSEPH COUNTY )
<br />IN THE MATTER relating to the improvement made under Improvement Resolution (none)
<br />and the Plans and specifications therefor comes now Virgil H. Reed who being duly sworn
<br />upon oath deposes and says he is acquainted with the Reed Construction Company the party
<br />to whom was awarded the contract and who performed the work under Improvement Resolution
<br />I No. SOUTH LAFAYETTE BOULEVARD PAVEMENT WIDENING.
<br />I
<br />That he is familiar with and personally knows the requirements of the plans and spe
<br />cifications of said improvement resolution and further knows that the said Reed Construe
<br />1tion Company, in°the performance of said work complied with all the terms and conditions
<br />of said plans and specifications in every particular, and that the material used was of
<br />the character, kind, quantity and quality required therein and according to and under th
<br />1. direction of the Board of Public Aorks and Safety.
<br />(Signed) Virgil H. Reed
<br />I
<br />Subscribed and sworn to before me this 18th day of November, 1950.
<br />(Signed) Richard B. Gartner, Sr. ,
<br />My Commission expires April 17, 1954 Notary Public, St. Joseph Co, Ind.
<br />I ENGINEER'S CERTIFICATE OF COMPLETION
<br />South Bend, Indiana
<br />iNovember 20, 1950
<br />To the Board of Public Works & Safety
<br />;,South Bend, Indiana
<br />We hereby certify that the contract between the City of South Bend, Owner, and the
<br />Reed Construction Company, Contractor, for the construction of the pavement widening
<br />improvement on SOUTH LAFAYETTE BOULEVARD, from the south curb line of Western Avenue to
<br />the north curb line of South Street, Under Improvement Resolution No. (none) has been
<br />completed in accordance with the plans and specifications for this project.
<br />• Repectfully submitted,
<br />Wilbur H. Gartner & Associates
<br />
|