Laserfiche WebLink
215 <br />j Mr. Miller informed the Board that stop signs have been installed to make four-way <br />I stops on Walnut- at LaPorte Avenue and on � ffalnut at Dunham Street. <br />i <br />I Mr. Miller and his assistant, Frank Vukovits, were authorized to attend a Traffic <br />(Safety Conference at Purdue University November 21, 1950. <br />BUSSES: A letter was received from Northern Indiana Transit, Incorporated, relative to <br />1!7 complaint referred to them November 13, 1950. The informed the Board that they would <br />(investigate the conditions which brought about this complaint and gave assurance that <br />• they will keep in close touch with the conditions as reported, and will take such steps <br />as are possible in each. instance. <br />i <br />ENGINEERING DEPARTMENT: Contractors' Bonds were approved and ordered filed for Thomas <br />(Darr, Russell B. Freese and Gino Vannoni & Sons Construction. <br />i <br />Certificates of Insurance were filed by John Gohr for the Niles Excavating Company. <br />{ <br />VACATION RESOLUTION NO. 2658 <br />This being the date set for hearing on assessment roll of l acatioine of the6 8, the <br />east <br />alley south of Fredrickson Street from 0'Brien Str <br />• �of O'Brien Street, the hearing was continued until December 41 1950. <br />RESOLUTION ADOPTING FINAL ASSESSPIENT ROLLS <br />Nos. 2634, 2638 and 2652 <br />I� South Bend, Indiana <br />- November 2G, 195 <br />�Be It Resolved, By the Board of Public Works and Safety- of the City of South Bend, India <br />na,e that the Primary or Preliminary Assessment Rolls adopted by the Board on the 6th day <br />of November, 1950, for the improvements of ALLEYS BETWEEN SCOTT, TAYLOR, DONALD AND CAL- <br />VERT STREETS, and No. 2638, KENDALL STREET PAVEMENT From the south lineof Calvert Street <br />• to the north line of Donald Street, AND No. 2652, KENDALL STREET PAVEMENT from the north <br />dine of Donald Street to the north line of Ewing Avenue, be and the same is in all thing <br />confirmed. <br />^ (Signed) R . S . Andry s i ak <br />Frank J. Bruggner <br />° F. K. Baer <br />I� Freels G. Noble, Clerk BOARD OF PUBLIC WORKS & SAFETY <br />CONTRACTORS COMPIE TION AFFIDAVIT <br />I8TATE OF INDIANA ) <br />) SS: <br />ST. JOSEPH COUNTY ) <br />IN THE MATTER relating to the improvement made under Improvement Resolution (none) <br />and the Plans and specifications therefor comes now Virgil H. Reed who being duly sworn <br />upon oath deposes and says he is acquainted with the Reed Construction Company the party <br />to whom was awarded the contract and who performed the work under Improvement Resolution <br />I No. SOUTH LAFAYETTE BOULEVARD PAVEMENT WIDENING. <br />I <br />That he is familiar with and personally knows the requirements of the plans and spe <br />cifications of said improvement resolution and further knows that the said Reed Construe <br />1tion Company, in°the performance of said work complied with all the terms and conditions <br />of said plans and specifications in every particular, and that the material used was of <br />the character, kind, quantity and quality required therein and according to and under th <br />1. direction of the Board of Public Aorks and Safety. <br />(Signed) Virgil H. Reed <br />I <br />Subscribed and sworn to before me this 18th day of November, 1950. <br />(Signed) Richard B. Gartner, Sr. , <br />My Commission expires April 17, 1954 Notary Public, St. Joseph Co, Ind. <br />I ENGINEER'S CERTIFICATE OF COMPLETION <br />South Bend, Indiana <br />iNovember 20, 1950 <br />To the Board of Public Works & Safety <br />;,South Bend, Indiana <br />We hereby certify that the contract between the City of South Bend, Owner, and the <br />Reed Construction Company, Contractor, for the construction of the pavement widening <br />improvement on SOUTH LAFAYETTE BOULEVARD, from the south curb line of Western Avenue to <br />the north curb line of South Street, Under Improvement Resolution No. (none) has been <br />completed in accordance with the plans and specifications for this project. <br />• Repectfully submitted, <br />Wilbur H. Gartner & Associates <br />