My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental Agreement No. 1 - The Troyer Group - Design work regarding LaSalle and Marquette Safe Routes to School
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Supplemental Agreement No. 1 - The Troyer Group - Design work regarding LaSalle and Marquette Safe Routes to School
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 2:44:08 PM
Creation date
10/25/2017 11:11:49 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Unit <br />Unit Price Total <br />GEOPHYSICAL INVESTIGATION <br />85 <br />Geophysical Investigations <br />Actual Cost <br />GEOTECHNICAL PROJECT MANAGEMENT <br />86 <br />Project Management <br />a. Project Coordination <br />mi <br />$1,620.00 <br />b. Project Website <br />LS <br />$3,420,00 <br />87 <br />Geotechnical Review <br />a. Structure Report <br />ea <br />$325.00 <br />b. Roadway Report <br />mi <br />$275.00 <br />Subtotal (Non -Destructive, Geophysical and Project Management) <br />PAVEMENT INVESTIGATION <br />1. <br />Mobilization of coring equipment <br />LS <br />$200.00 <br />2. <br />Mobilization mileage for coring equipment <br />mi <br />$1.85 <br />3. <br />Pavement core (partial depth) <br />ea <br />$125.00 <br />4. <br />Pavement core (full depth) <br />a. Standard <br />ea <br />$190.00 <br />b. Night time <br />ea <br />$223.00 <br />S. <br />Sub -base sample <br />ea <br />$60.00 <br />6. <br />Cement concrete pavement core density determination <br />ea <br />$33.00 <br />7. <br />Cement concrete core compressive strength test <br />ea <br />$31.50 <br />8. <br />Bituminous extraction test <br />ea <br />$84.00 <br />9. <br />Sieve analysis of extracted aggregate test <br />ea <br />$56.00 <br />10. <br />Recovery of asphalt from solution by Abson method <br />ea <br />$350.00 <br />11. <br />Theoretical maximum specific gravity test <br />ea <br />$70.00 <br />12, <br />Bulk specific gravity test <br />ea <br />$30.00 <br />13, <br />Air voids calculation <br />ea <br />$28.00 <br />14. <br />Core report for partial depth core <br />ea <br />$34.00 <br />15. <br />Core report for full depth core <br />ea <br />$42,00 <br />16. <br />Pavement analysis and report <br />ea <br />$770.00 <br />Subtotal (Pavement Investigation) <br />Summary of Fees <br />Geotechnical Field $11,706.50 <br />Geotechnical Laboratory $1,184.00 <br />Geotechnical Engineering $1,660.00 <br />Construction Inspection and Monitoring <br />Non -Destructive, Geophysical and Project Management <br />Pavement Investigation <br />Estimated Total $14,560.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.