Laserfiche WebLink
Unit <br />Unit Price Total <br />b. Modified Proctor <br />ea <br />$147.00 <br />59 Soil Support Testing <br />a. California Bearing Ratio Test <br />ea <br />$515.00 <br />b. Subgrade Resilient Modulus <br />ea <br />$600.00 <br />60 Collapse Potential Evaluation Test <br />a. Silty Soil (Loess) <br />ea <br />$370.00 <br />b. Cohesive or Expansive Soils <br />ea <br />$441.00 <br />61 Water Soluble Sulfate Test <br />ea <br />$100.00 <br />62 Water Soluble Chloride Test <br />2 ea <br />$100.00 $200.00 <br />63 Soil Resistivity Test <br />ea <br />$131.00 <br />64 a. Slake Durability Index Test <br />ea <br />$122.00 <br />b. Jar Slake Test <br />ea <br />$13.00 <br />Subtotal (Geotechnical Laboratory) $1,184.00 <br />GEOTECHNICAL ENGINEERING <br />65 <br />Geotechnical profile and related work <br />a. Without soil subgrade drawings <br />First mile <br />LS <br />$1,150.00 <br />Each additional mile <br />mi <br />$525.00 <br />b. With soil subgrade drawings <br />First mile <br />LS <br />$1.365,00 <br />Each additional mile <br />mi <br />$600.00 <br />c. Soil subgrade drawings (only) <br />First mile <br />LS <br />$350.00 <br />Each additional mile <br />mi <br />$220.00 <br />66 <br />Geotechnical report <br />a, Without soil subgrade investigation <br />First mile <br />1 LS <br />$1,660.00 $1,660.00 <br />Each additional mile <br />mi <br />$700.00 <br />b. With soil subgrade investigation <br />First mile <br />LS <br />$1,900,00 <br />Each additional mile <br />mi <br />$800,00 <br />c. Soil subgrade investigation (only) <br />First mile <br />LS <br />$600,00 <br />Each additional mile <br />mi <br />$360.00 <br />67 <br />Settlement analysis and recommendations for embankment <br />a. Proposed embankment <br />ea <br />$495.00 <br />b. Proposed and existing embankment <br />ea <br />$550.00 <br />68 <br />Ground modification design <br />ea <br />$1,450.00 <br />69 <br />Slope stability analysis <br />a. C, 0 or C & 0 analysis <br />ea <br />$770.00 <br />b. Corrective measures <br />ea <br />$770.00 <br />c. Stage construction corrective method <br />ea <br />$1,340.00 <br />70 <br />Bridge foundation analysis and recommendations <br />a. Shallow foundation <br />ea <br />$475.00 <br />