My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental Agreement No. 1 - The Troyer Group - Design work regarding LaSalle and Marquette Safe Routes to School
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Supplemental Agreement No. 1 - The Troyer Group - Design work regarding LaSalle and Marquette Safe Routes to School
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 2:44:08 PM
Creation date
10/25/2017 11:11:49 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Unit <br />Unit Price <br />Total <br />29. <br />Field vane shear test <br />a. Standard <br />ea <br />$110.00 <br />b. Night time <br />ea <br />$130.00 <br />30. <br />41/,in. cased hole <br />ft <br />$12.00 <br />31. <br />Installation of Geotechnical Instruments <br />a. Inclinometer casing installation <br />i. Standard <br />ft <br />$14.07 <br />ii. Night time <br />ft <br />$16.60 <br />b. Piezometer installation up to 25 ft below surface <br />ea <br />$245.00 <br />c. Piezometer installation deeper than 25 ft below surface <br />ea <br />$270.00 <br />d. Metal protective outer cover for inclinometer and piezometer casings <br />ea <br />$120,00 <br />32. <br />Geotechnical engineer <br />8 hr <br />$115,00 <br />$920,00 <br />33. <br />Railroad expenses <br />Actual Cost <br />34. <br />Twenty-four hour water levels <br />a. Field measurements per borehole <br />i. Standard <br />2 ea <br />$36.50 <br />$73.00 <br />H. Night time <br />ea <br />$43.00 <br />b. PVC slotted pipe <br />ft <br />$5.60 <br />35. <br />Special borehole backfilling <br />a. 0 to 30 ft <br />i. SPT <br />a. Standard <br />25 ea <br />$105.00 <br />$2,625.00 <br />b. Night time <br />ea <br />$124.00 <br />ii . CPT <br />a. Standard <br />ea <br />$45.00 <br />b. Night time <br />ea <br />$53.00 <br />b. More than 30 ft <br />1. SPT <br />a. Standard <br />ft <br />$6.30 <br />b. Night time <br />ft <br />$7.50 <br />ii . CPT <br />a. Standard <br />ea <br />$1.88 <br />b. Nighttime <br />ea <br />$2.21 <br />c. Pavement restoration <br />i. Standard <br />ea <br />$58.00 <br />ii. Nighttime <br />ea <br />$68.00 <br />36. <br />Dozer rental <br />Actual Cost <br />37. <br />Traffic control <br />a. Flag crew <br />3 day <br />$700.00 <br />$2,100,00 <br />b. Equipment Rental <br />Actual Cost <br />c. Flag crew with equipment <br />day <br />$800.00 <br />38. <br />Centerline surveying <br />Actual Cost <br />Subtotal (Geotechnical Field) $11,706.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.