Laserfiche WebLink
SCOPE OF WORK <br />CITY OF SOUTH BEND <br />ar!ebs..sv <br />PROJECT NAME: Fellows Street Raised Crosswalk <br />PROJECT NO. 117-086 <br />QUOTES DUE October 24, 2017 <br />PROJECT DESCRIPTION <br />A. The project, includes the furnishing of all equipment, material, insurance, and labor for construction of <br />a raised crosswalk on Fellows Street approximately 185 feet south of Bowman Street, all within the City <br />of South Bend, IN. Work to be performed shall include removal of existing items and construction of <br />curb, sidewalk and a raised crosswalk, as specified in these documents. <br />IL PREVAILING SPECIFCIATIONS AND DESIGN & CONSTRUCTION STANDARDS <br />A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN & <br />CONSTRUCTION STANDARDS, most recent version, are to be used on this project. <br />B. Each Quote provider is specifically instructed to become completely familiar with the most recent <br />version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION STANDARDS <br />prior to submitting a quote. <br />C. Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the 2018 <br />INDOT Standard Specifications for the letting effective after September 1, 2017, <br />D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING <br />SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. <br />E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, <br />the SPECIAL PROVISIONS will govern. <br />III. TERM "OR EQUAL" <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Where the term "or equal' is used in these specifications, the Quote provider deviating from <br />specified item shall file with his/her Quote a letter fully explaining and justifying his/her proposed <br />article or equal. The City of South Bend shall be the sole judge in determining if the "or equal' <br />offered meets the specification. <br />IV. TAX EXEMPT <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Materials and properties purchased under contract with the Owner that becomes a permanent part <br />of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). <br />The exemption number will be furnished to the Contractor upon award. <br />Version 10/18/2016 Page - 1 Public Works Quote <br />