QUOTE/PROPOSAL
<br />CITY OF SOUTH BEND
<br />PROJECT NAME Fellows Street Raised Crosswalk
<br />PROJECT NO. 117.086
<br />QUOTES DUE October 24, 2017
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Maintaining Traffic
<br />1
<br />LSUM
<br />5� OQp '00
<br />$ S 000, DO
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LSUM
<br />SjOap, Oa
<br />$ 5,7 000. OcO
<br />3
<br />Construction Engineering
<br />1
<br />LSUM
<br />Z, 5" a - pv
<br />$ 315baO6
<br />4
<br />Clearing Right -of -Way
<br />1
<br />LSUM
<br />r,��&>Z>. DO
<br />$ j 2/000,O0
<br />5
<br />Temporary Erosion and Sediment
<br />Control
<br />1
<br />LSUM
<br />�� DOb.00
<br />$
<br />6
<br />Compacted Aggregate, No. 53,
<br />Base
<br />46
<br />TON
<br />Sl ,p0
<br />$ ,�� S�jD• Bo
<br />7
<br />Milling, Profile
<br />345
<br />SYS
<br />$ 9� yg7, SO
<br />8
<br />HMA Surface, Type B, 9.5 mm
<br />30
<br />TON
<br />�� 00
<br />'
<br />$ qj9,s0.00
<br />9
<br />Raised Crosswalk, Concrete,
<br />12-in. Min.
<br />114
<br />SYS
<br />�ys.00
<br />$ ��, lQ 30.00
<br />10
<br />Patch, Concrete, 8-in.
<br />23
<br />SYS
<br />50,00
<br />$ f 1sD,0o
<br />11
<br />Sidewalk, Concrete, 4-in,
<br />114
<br />SYS
<br />50,00
<br />$ 5/700.04>
<br />12
<br />Curb Ramp, Concrete, 6-in.
<br />13
<br />SYS
<br />jg0�00
<br />$ z� y70,06
<br />13
<br />Curb, Concrete, 6-in.
<br />101
<br />LFT
<br />D0
<br />$
<br />14
<br />PCCP for Approaches, 9-in.
<br />23
<br />SYS
<br />0 d
<br />$ Ob
<br />15
<br />Nursery Sodding
<br />121
<br />SYS
<br />�C Od
<br />$ 3, pis; 00
<br />16
<br />Plant, Deciduous Tree, Single
<br />Stem, 2-in.
<br />1
<br />EACH
<br />6251,00
<br />$ 00
<br />17
<br />Sign, Sheet, 0.080", with Legend
<br />34
<br />SFT
<br />.X9,00
<br />$
<br />18
<br />Pavement Message Marking,
<br />Preformed Plastic, Nested
<br />Chevrons, Grooved
<br />2
<br />EACH
<br />100, 00
<br />$ Ltl t 00 , 00
<br />It
<br />19]Yellow,
<br />Line, Thermoplastic, Solid,
<br />4-in.
<br />311
<br />LFT
<br />�, 0o
<br />$
<br />l
<br />Total Amount of Quote
<br />$ 1 �� 1113156
<br />Version 10/18/2016 Page - 17 Public Works Quote
<br />
|