Laserfiche WebLink
Transport- <br />ation: Successful bidder is required to pick up from and deliver units to Central <br />Services, 1045 West Sample Street, South Bend, Indiana, 46619. Bidder mast <br />specify location of installation and nearest repair facility. <br />Inspections: Successful bidder will build one (1) complete car and it will be inspected by <br />members of Central Services and South Bend Police Department. After first car <br />is signed off on by Fleet Manager, the vendor shall proceed with the remainder of <br />the vehicle installs. All vehicles and work are subject to random inspections by <br />the Manager of Central Services and or a representative of the South Bend Police <br />Department. <br />Timeline: Bidder to state as accurately as possible the length of time to complete the <br />installation of equipment in each vehicle as well as total timeframe of entire project. <br />List of <br />Equipment <br />To Install: The following equipment supplied by the City of South Bend shall be installed: <br />Patrol Car: <br />1.) Install and program customer supplied LED lights in headlights and <br />taillights and connect to light/siren control. <br />2.) 50 amp power and ground leads to center console area. <br />3.) Install and program customer supplied red/blue LED lights in front <br />fender plastic inserts and connect to light/siren control. <br />4.) Install and program red/blue LED lights on rear bumper cover on each <br />side of license plate. <br />5.) One (1) RRA 4983A 800 MHz antenna kit mounted on trunk with <br />one lead ran to center console. <br />6.) Install customer supplied GPS antenna in front of light bar. Use center <br />of roof 16" back from windshield. Run wires to center console. <br />7.) Install customer supplied light bar to roof and run wires to center <br />console and connect to light/siren control. <br />8.) Install and program customer supplied in -car two camera video <br />system (dash mount and back seat mount). <br />9.) Install customer supplied center console with arm rest. <br />10.) Install customer supplied laptop docking station and mount. <br />11.) install customer supplied light/siren control. <br />12.) Install customer supplied flashlight charger. <br />13.) Install customer supplied prisoner cage. <br />14.) install customer supplied rifle or shotgun lock. <br />15.) Install customer supplied fire extinguisher. <br />16.) Install customer supplied stop sticks. <br />17.) Install customer supplied printer on cage wall above passenger head <br />rest and connect to laptop docking station. <br />18.) Install customer supplied 800 MHz speaker on plexiglass cage wall. <br />19.) Install customer supplied siren speakers and connect to light/siren control. <br />11 <br />