My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 15 - WWTP Secondary Improvements Project No. 114-053 - Thieneman Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 15 - WWTP Secondary Improvements Project No. 114-053 - Thieneman Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:57:17 PM
Creation date
10/25/2017 10:37:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M`ae�`�jli_liicr+��` VY"IfNYOSV!/ i!:✓ Lr'►'Pf� I K%ti/• <br />1 N� <br />a �k <br />CONTRACTORS & ENGINEERS <br />J�+ p <br />9111 Louisiana Street <br />Merrillville, Indiana 46410 <br />July 18, 2017 <br />Thieneman Construction <br />17219 Foundation <br />Westfield, IN <br />ATTN: Mr. Craig Steele <br />RE: SOUTH BEND WWTP <br />Mr. Steele: <br />We are submitting for your use some field reports for additional work we have been directed to <br />perform. <br />Phone: <br />(219) 769-6007 <br />Fax: <br />(219) 769-0565 <br />1. Field Reports 107521, 107522, 107523, and 107524: <br />Work to remove and reroute conduits that are in the way of required coring for new WAS <br />piping. <br />Material <br />$ 547.00 <br />Equipment <br />72.00 <br />Labor <br />2,574.00 <br />PM <br />135,00 <br />Profit <br />166.00 <br />Total <br />$ 3,494.00 <br />XField <br />Report 1.07519: <br />rElectrical <br />hookup of a Plasma <br />cutter in basement of aeration tanks. <br />Our lump sum for this work is One Hundred Ninety Eight and 00/100 Dollars. (198.00) <br />Field Report 107518: <br />(10? Electrical hookup of a 8 inch pump at gallery 93 to drain channel at clarifier 4 and 5. <br />Our lump sum for this work is Five Hundred Ninety Four and 00/100 Dollars ($594.00). <br />If you have any questions or comments please feel free to contact me. <br />Sincerely yours, <br />Swej-iey.Ilec-trio Company, Inc. <br />TI%7►,ta�c YNihl'►r�eyer <br />
The URL can be used to link to this page
Your browser does not support the video tag.