My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 15 - WWTP Secondary Improvements Project No. 114-053 - Thieneman Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 15 - WWTP Secondary Improvements Project No. 114-053 - Thieneman Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:57:17 PM
Creation date
10/25/2017 10:37:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
+ PUMPING CONTRACTOR <br />+ CONSULTING SERVICE <br />• DEEP WELLS AND HIGH VOLUME TURBINE PUMPS <br />+ COMMERCIAL AND MUNICIPAL WATER SUPPLY WELLS <br />DEWATERING . SPECIALTY AND DUAL ROTARY DRILLING FOR LARGE DIAMETER, DEEP OR <br />DIFFICULT FORMATIONS <br />Ss CONSTRUCTION CO. <br />5175 Clay Ave. SW — Wyoming, Michigan 49548 —Phone (616) 538-8010 —1=ax (616) 588-0708 <br />Email: keliey@kelleydewatering.com Website: www.kelloydewatering.com <br />July 11, 2017 <br />Thieneman Construction, Inc. Fax: (219) 947-4711 <br />521 W. 84th Drive, Suite A <br />Merrillville, IN. 46410 <br />Attn: Craig Steele <br />craig.stecle@thienemanconstruction.com <br />Re: Replacement of Permanent We117 Motor <br />South Bend, IN. <br />Gentlemen: <br />After inspection and testing of Permanent Pump 7, its failure was caused by bearing failure in the, motor due <br />to excessive cavitation. The liquid end of the pump was tested and ran smooth and produced factory specified <br />pressure, <br />The failed motor shaft when measured revealed bearing wear which is indicative of excessive cavitation, <br />This service and repair will not be covered under warranty. I have broken out the following charges; <br />e 5/30/17 Mob/Demob from Grand Rapids/South Bend $933 ($4 x 117 miles round trip) <br />• 5/31/17 Pull Permanent Pump #7 $402 ($134 x 3 hours) <br />Test and repair $170 ($85 x 2 hours) est. <br />• Mob/Demob from Grand Rapids/South Bend $933 ($4 x 117 miles round trip) <br />e Set Permanent Pump #7 536 ($134 x 4 hours) est. <br />TOTAL $ , 99-- z� 74 <br />Please call or write with questions or concerns. <br />Sincerely, <br />Lester FI orn <br />
The URL can be used to link to this page
Your browser does not support the video tag.