My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 15 - WWTP Secondary Improvements Project No. 114-053 - Thieneman Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No. 15 - WWTP Secondary Improvements Project No. 114-053 - Thieneman Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:57:17 PM
Creation date
10/25/2017 10:37:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sheatl <br />South Bond Secondary WaiterTreatmsnt Improvernerds <br />Proleot o 1608 8007 <br />Oavtdeon Pinch CoeOnge LLC <br />Office: 31749"33D <br />450 East 98th Street, Ste 800, Indianapolis, IN 40240 <br />Contract Price $180,673.74 <br />Hours <br />2728 <br />Mobiltutlon <br />$16,644.23 <br />10,26% <br />280 <br />280 <br />Demobilization <br />$1,988.88 <br />1.10% <br />30 <br />30 <br />Clint onVS: <br />878 <br />- Clarifier Equipment <br />$11,921,29 <br />6.00% <br />180 <br />- Launder Troughs - Prep Wotid9lasting <br />$13,245.88 <br />7.33% <br />200 <br />-Launder Troughs- PalntinglCoatings <br />$12,914.73 <br />7.15% <br />195 <br />Cladflor#7: <br />678 <br />- ClarMor Equlpmom <br />$11,921.29 <br />6.50% <br />180 <br />- Launder Troughs - Prep WoflAasting <br />$13,245,68 <br />7.33% <br />200 <br />- Launder Troughs - PoirdinglCoallngs <br />$12,914.73 <br />7.15% <br />196 <br />RAS Pump Station <br />160 <br />- Concrete Prep Woric 1811ating <br />$5,208,351 �� iy� <br />2,g3% <br />eo <br />- Concrete Coa0ngelPainting <br />$2,640AS <br />1.476,E <br />40 <br />-P1plgffitc. <br />$2,649.18 <br />1A7% <br />40 <br />Gallery 4 • PipingNatvaelMstenslEtc. <br />$2,649.18 <br />1,47% <br />40 <br />40 <br />influentlE6luent Channels <br />760 <br />- Concrete Prep Worst <br />$30,737.03 <br />21,00% <br />80D <br />- Conorete Coatings/painting <br />$8,609.82 <br />4,77% <br />130 <br />- Plpinglf ic. <br />$11324.69 <br />0.739E <br />20 <br />Aeration Gallery; <br />160 <br />PIPinglFlttingemolvewmateralEtc. <br />$10,506.10 <br />5.879E <br />160 <br />Meter Vaults Slab <br />$529.84 <br />0.299E <br />8 <br />8 <br />PipingfFittlnye/ValveaftterelfWtc. <br />$3,311.47 <br />1.639E <br />60 <br />50 <br />BollardatHydrant/Mlsc Metal <br />$8,522.94 <br />3.879E <br />100 <br />100 <br />ConnratTotal <br />$180,673.74 <br />Total Hours <br />2728 <br />2726 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.