My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Project Completion Affidavit - Calvert Street Lift Station Replacement Project No 116-053 - HRP Construction Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Order and Project Completion Affidavits
>
Change Order No. 3 - Project Completion Affidavit - Calvert Street Lift Station Replacement Project No 116-053 - HRP Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 1:59:14 PM
Creation date
10/25/2017 10:36:08 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION1 <br />EXCAVATING•SEWERS•WATERMAINS <br />"QVoJtn3 90 J-11 0 f ,Saw ,,- <br />REQUEST FOR CHANGE ORDER <br />TO: <br />City of South' Bend <br />Attn:_aacob Klosinski <br />3113 Riverside Drive <br />South Bend, IN 46628 <br />PROJECT: <br />Calvert Street Lift Station <br />HRP Project: <br />1483 <br />RE: <br />Request for compensation for <br />electric related items <br />DATE: September 1, 2017 <br />RFCO M. 8 <br />0 <br />OWNER: City of South Bend <br />ENGINEER: DLZ <br />Description of Request: A. To have Michlana Contracting provide and install an additional conduit <br />stubbed out of the control cabinet for future use. <br />B. To have Michiana Contracting lower the weather station for better access by <br />City personnel. <br />C. Reimbursement to HRP for lift station operation incurred through AEP delay. <br />Basis of Proposal: A. Requested by Owner. <br />B. Requested by Owner. <br />C. Owner was receiving benefit of station. <br />Description <br />QQt Unit Unit Price <br />Extension <br />A. Michiana Contracting proposal with HRP <br />1 LS $129.00 <br />$129.00 <br />mark-up. See attached. <br />B. Michiana Contracting proposal with HRP <br />1 LS LS 6a.0g. 00 <br />$. SILO .00 <br />mark-up. See attached. <br />C. AEP charges with HRP mark-up. See <br />34 Day $13.21 <br />$449.00 <br />attached. <br />Total for Change Order $786.00 <br />Joe Saggars — HRP Construction Inc <br />Date <br />Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271.-7800 <br />Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 <br />
The URL can be used to link to this page
Your browser does not support the video tag.