My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to Professional Services Agreement - M E Design Services - Studebaker Museum Rooftop Unit Replacement Scope
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Amendment to Professional Services Agreement - M E Design Services - Studebaker Museum Rooftop Unit Replacement Scope
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 4:13:37 PM
Creation date
10/25/2017 10:31:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated July 13, 2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: July 13, 2017 <br />b. Owner: Board of Public Works, City of South Bend <br />C. Engineer: Thomas R. Cook dba M/E Design Services <br />d. Project: 117-081 Studebaker Museum Rooftop Unit Replacements <br />2. Description of Modifications: <br />[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to <br />this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity <br />with respect to the modifications to be made. Use paragraph numbers in this document for ease of <br />reference herein and in future correspondence or amendments.] <br />a. Engineer shall perform or furnish the following Additional Services: <br />i. Review impact to the design of alternative rooftop units and <br />configurations. <br />ii. Review whether the areas served by RTU-5 and RTU-8 can be heated by <br />other means or through a modified control sequence to allow the building <br />to be maintained at temperature without using the faulty heat exchangers <br />in these two units. <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br />(See above) <br />C. The responsibilities of Owner are modified as follows: <br />The Owner will assist in coordination with Museum personnel and the <br />Museum's Maintenance Contractor to provide necessary information about <br />current equipment issues. <br />Page 1 <br />(Exhibit K— (Amendment to Owner -Engineer Agreement) —Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services, <br />Copyright 0 2008 National society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.