Laserfiche WebLink
49 <br />February 27, 1950 h <br />I <br />A regular meeting of the Board of Public Works washeld on Monday, February 27, 1950. <br />All members were present. Salary Claims in the amount of $28,831.48 were a.pproved,and <br />ordered paid. Claims of the following suppliers in the amount of $3,716.64 were approved <br />Viand ordered paid: <br />i <br />Continental Oil Company 30.75 Indiana & Michigan Electric Co, 1.42�' <br />jIndiana & Michigan Electric Co. 511.60 Indiana & Michigan Electric Co. 89.60� <br />Shoemaker, 0. J.,.Inc. 50:,20 Korte Brothers, Inc. 34.38; <br />Trojan Tool Egmipment Co. 31.65 Mittler Supply, Inca 10.271 <br />Weisberger Brothers, Inc. 5.14 Municipal Supply Co. 193.00` <br />STREET & TRAFFICE: Richey Radiator Service 20.50i <br />uda. Company 129,50 Rose, Jacob <br />Continental Oil Company 74.06 Rose, Jacob 32.50 <br />(Continental Oil Company 1768.,41 PARKING METER <br />Doyle Chemical Products 199.00 Vennet, Maurice C, 40.00 <br />jEnglewood Electrical Supply 486.16 <br />__, Ij <br />TRA FIC ENQINEERIRIG: Mr. Ernest Miller, Traffic Engineer was present and matters pertain,, <br />jing,to his Department were discussed. <br />• I I�''ROADS • A letter was directed to Mr. <br />.� .Aaron'Huguenard, attorney. for the Chicago South l <br />{{Shore and South Bend Railroad informing him that breaks along the tracks of the South Shoe <br />Pailroad were protruding from four to six inches above ground level causing damage to ca.rg <br />,by cutting the tires and the jarring of the railroad cars has caused plaster to break in '! <br />adjacent residences. Mr. Huguenard was a.;ked to contact the railroad with the request <br />(that this matter be taken care of immediately., <br />11GINEERING DEPARTMENT: The Board approved a Contract Bond for the'Rieth-Riley Construe- <br />tion Company in the amount of $32,768.45 for the resurfacing of East Jefferson Boulevard -I, <br />'from the West line of Niles Avenue to Eddy Street and West Washington Avenue from Chestnut,+' <br />street to Main Street. h <br />• AIs <br />An Excavation Bond was approved and ordered filed for Richard E. Carlton, in the I <br />�moi�.nt of $1, 000.00. I <br />El <br />0- <br />0 <br />The Board approved sewer plans for the Colpaert Realty Company. <br />The Clerk of the Board was authorized to advertise for a panel truck for the Enginee <br />ng Department. Bids to be returned on March 20, 1950. <br />The Cleri of the Board was also authorized to advertise for that portion of the Loga. <br />treet Bridge which is to be repaired By the City of South Bend. These bids are returnab <br />n March 27, 1950 at 10:00 a.m. I. <br />The Colpaert Realty Company filed assessment rolls for sewers on Chicago Street from <br />ord Street to 150 feet south of Western Avenue; Illinois Street from Ford Street to 150 <br />eet South of Western and Wellington Street from Ford Street to 200 feet South of Western <br />venue. This work was done by the Miles Excavating Company and paid for by the Colpaert <br />ealty Company. J' <br />I�. <br />Mr. Charles Whiting representing the South Bend .Awning Company appeared before the <br />oard to request permission to install a permanent type awning at 803 South Chapin Streeti! <br />nd the Board, upon the Engineer's recommendation, approved his request. <br />BEET DEPART1v NT:_ Mr. Melton Brannan, Street Commissioner, was present and matters per- <br />ining to his Department were discussed. <br />The Board accepted the following bids for materials for the Street Department: Sout <br />,end Lumber Company; Rieth-Riley Construction_ Company; -American Steel Supply Corporation; <br />enry Eckler Manufacturing; Kuert Concrete Company; South Bend Sand & Gra.vel; WTeisberger <br />rothers, Inc.; E. R. Newland Company; Schuyler Rose; Andresen Corporation; General Build <br />ng Materials, Inc.; Standard Oil Company; Bituminous Materials Company; Seneca. Petroleum <br />ompany. <br />.ARKING PATER DEPARTMENT:_ Mr. Maurice C. Vennet, Auditor, presented his report for the I <br />eek ending February 25, 1950. <br />ELTITERY DEPARTMENT: Mr. Stanley Leszczynski, Sekton, was present and matters pertaining <br />o his Department were discussed. <br />There being no further business to come before the meeting, the Board adjourned at <br />0:30 a.m. , <br />ST: <br />IF <br />