Laserfiche WebLink
6.1 Enemy Saviny-s. The annual amount of energy savings is the surn of the below listed ECMs. The Savings <br />are based on the listed Energy Cost Avoidance Guarantee Practices contained in Section 6.3 herein. <br /># ECM D <br />1 CRC Bu <br />2 CRC Me <br />3 Parking <br />4 <br />5 <br />6 <br />Parking <br />Parking <br />Parking <br />escription Energy Savings <br />ilding lighting Retrofit $38,294 <br />chanical & Controls $134,975 <br />Lighting Retrofits $86,052 <br />Envelope Improvements $1,566 <br />Mechanical & Controls $27,470 <br />Miscellaneous $144 <br />TOTAL GUARANTEED ENERGY SAVINGS $288,501 <br />Refer to Schedule C 1 attached hereto and incorporated herein by reference for calculations and assumptions used to <br />calculate Energy Savings. <br />6.3 Energy Cost Avoidance Guarantee Practices: <br />6.3.1 BASELINE Operatine Parameters are the facility(s) and system(s) operations measured and/or observed before commencement of the Work. The data summarized will be used in the calculation of the baseline energy <br />consumption and/or demand and for calculating baseline adjustments for changes in facility operation that occur <br />during the Guarantee Period. ESCO and CITY agree that the operating parameters specified in this section are <br />representative of equipment operating characteristics during the Base Year specified in this Agreement. The <br />following data was collected with the assistance of Jeff Linneman, Assistant Director of Facilities and his staff. <br />See Schedule E — Baseline Energy Consumption and Schedule H — Systems Start -Up and <br />Commissioning; Operating Parameters of Installed Equipment <br />6.3.2 BASELINE Adjustments may be made to the baseline utility usage to reflect projects, which <br />may increase the energy usage or changes in facility operation from the base year, which increase utility usage. <br />Baseline adjustments may be made for the following items and any additional items as they are identified: <br />1. Additional energy usage from increasing or adding ventilation <br />2. Additional energy from adding air conditioning to areas which were not air conditioned during the base <br />year. <br />3. Any repair or replacement of equipment which may increase energy usage <br />4. Any change in equipment operation from the base year <br />See Attachment C2, attached hereto and incorporated herein by reference, for- Baseline Adjustments which <br />include: <br />1. Increase it7 energy use for• proper opernatioof Fountain Square Soirtlt Par•Icirrg Garage parlcirtg area <br />ventilation system <br />2. Increase in energy use for proper operation of Elm Street Parking Gat -age parking area ventilation <br />System <br />3. Increase in energy ttse for proper lighting of levels A and B at Elm Street Parking Garage <br />6.3.3 POST RETROFIT Operating Parameters of the facility(s) and system(s) after completion of Work. <br />The data summarized will be used in the calculation of the post -retrofit energy consumption and/or demand. <br />ESCO and CITY agree that the post retrofit operating parameters specified in this section are representative of <br />equipment operating characteristics during the Guarantee Period specified in this Agreement <br />Schedule C . Page 10 <br />Refer to Schedule C 1 attached hereto and incorporated herein by reference for calculations and assumptions used to <br />calculate Energy Savings. <br />6.3 Energy Cost Avoidance Guarantee Practices: <br />6.3.1 BASELINE Operatine Parameters are the facility(s) and system(s) operations measured and/or observed before commencement of the Work. The data summarized will be used in the calculation of the baseline energy <br />consumption and/or demand and for calculating baseline adjustments for changes in facility operation that occur <br />during the Guarantee Period. ESCO and CITY agree that the operating parameters specified in this section are <br />representative of equipment operating characteristics during the Base Year specified in this Agreement. The <br />following data was collected with the assistance of Jeff Linneman, Assistant Director of Facilities and his staff. <br />See Schedule E — Baseline Energy Consumption and Schedule H — Systems Start -Up and <br />Commissioning; Operating Parameters of Installed Equipment <br />6.3.2 BASELINE Adjustments may be made to the baseline utility usage to reflect projects, which <br />may increase the energy usage or changes in facility operation from the base year, which increase utility usage. <br />Baseline adjustments may be made for the following items and any additional items as they are identified: <br />1. Additional energy usage from increasing or adding ventilation <br />2. Additional energy from adding air conditioning to areas which were not air conditioned during the base <br />year. <br />3. Any repair or replacement of equipment which may increase energy usage <br />4. Any change in equipment operation from the base year <br />See Attachment C2, attached hereto and incorporated herein by reference, for- Baseline Adjustments which <br />include: <br />1. Increase it7 energy use for• proper opernatioof Fountain Square Soirtlt Par•Icirrg Garage parlcirtg area <br />ventilation system <br />2. Increase in energy use for proper operation of Elm Street Parking Gat -age parking area ventilation <br />System <br />3. Increase in energy ttse for proper lighting of levels A and B at Elm Street Parking Garage <br />6.3.3 POST RETROFIT Operating Parameters of the facility(s) and system(s) after completion of Work. <br />The data summarized will be used in the calculation of the post -retrofit energy consumption and/or demand. <br />ESCO and CITY agree that the post retrofit operating parameters specified in this section are representative of <br />equipment operating characteristics during the Guarantee Period specified in this Agreement <br />Schedule C . Page 10 <br />