Laserfiche WebLink
Schedule A and its Attachment(s). The CITY accepts the Energy Guarantee and Schedule of Savings and agrees to <br />the M&V plan set forth in this Schedule F. <br />5. CITY RESPONSIBILITIES PROVISIONS <br />5.1. Equipment Subieet to these Provisions. Equipment affecting the performance of the Energy Saving <br />Guarantee includes (1) equipment provided as per Schedule A — Scope of Work and its Attachment(s), (2) <br />modifications made to existing equipment as outlined in Schedule A — Scope of Work and its Attachments(s), (3) <br />existing or new equipment not provided or modified under this Agreement but materially affected by the work <br />provided per Schedule A — Scope of Work and its Attachment(s) and consuming energy or water via utility meters <br />covered by. this Agreement. <br />5.2. CITY Maintenance and Replacement Responsibilities. During the term of this Agreement, for all <br />equipment covered by the Energy Savings Guarantee of this Agreement, the CITY shall perform on -going <br />:maintenance and accomplish component replacement and equipment repairs in accordance with manufacturer's <br />standards and practices and take all reasonable measures to insure the equipment is operating at full efficiency. <br />Component replacement and equipment repairs must be accomplished in a timely fashion. Additionally, CITY <br />shall insure such equipment is operated at all times in accordance with applicable manufacturer's specifications, <br />ESCO specifications, and the requirements contained herein. For all non-ESCO maintenance actions, CITY shall <br />document and make available to ESCO maintenance dates and tasks accomplished, the start date and duration of <br />all deficient equipment operation and the subsequent corrective action and/or repair dates. Failure of the CITY to <br />operate the equipment per the specifications, repair any deficiencies in a timely manner, and perform the ongoing <br />maintenance functions in accordance with the standards and practices during the Guarantee period will allow <br />ESCO to adjust the Guarantee accordingly. <br />5.2.1. CITY shall replace any vandalized or any failed equipment or component no longer warranted by ESCO <br />or the manufacturer, with equipment or components of equal or greater efficiency value than installed by ESCO, <br />for the full Guarantee Term, <br />5.2.2. CITY shall be responsible to investigate and correct any reported deficiencies not covered under this <br />Support Services Agreement. <br />5.3. CITY Granted Access for Remote Diagnostics. CITY shall allow ESCO to perform remote diagnostics on <br />all equipment associated with the Energy Savings Guarantee for operational compliance with the manufacturer's <br />specifications, and the requirements of Schedule D and Schedule C contained herein. CITY shall provide one or <br />both of the following described in section 5.3.1 or 5.3.2, as applicable. <br />5.3.1. Dial -In Remote Access: CITY is responsible for implementation and costs for first-time installation and <br />on -going maintenance and subscription fees for two (2) dedicated phone lines and two (2) modems) at each front- <br />end computer and one (1) dedicated phone line at each controller not hardwire connected to a front-end computer. <br />5.3.2. TCP/IP Remote Access: CITY is responsible for implementation and costs for remote ESCO access <br />through CITY's firewall(s) to the controllers and front-end computer(s) by one (1) Measurement and Verification <br />Specialist including but not Iimited to a dedicated static IP address, installation and on -going maintenance and <br />subscription and licensing fees for access hardware and software and one(1) station license dedicated to the remote <br />user. <br />5.4 CITY Reporting Responsibilities. CITY shall report to ESCO in writing within fifteen (15) days of the <br />following changes or events. The Guarantee or the realized Cost Avoidance will be adjusted accordingly. Failure <br />to do so will result in adjustment of the Guarantee. <br />(1) any additional energy source or change in existing energy source or supplier that the CITY may negotiate <br />during the term of this Guarantee and/or, <br />Schedule C Page 7 <br />