Laserfiche WebLink
Stioulated Caoital Avoidance Savinas <br />The annual Capital Avoidance Savings identified in the table below are Stipulated Savings <br />documented by the calculations and methodologies described in Appendix G. CUSTOMER <br />agrees that the Stipulated Savings are deemed satisfied upon installation of the related ECMs <br />and the Stipulated Savings shall not be measured or audited. <br />Description <br />Stipulated Savings <br />ECM 1 Lighting <br />$18 993 <br />ECM 2 Building Controls <br />$80,582 <br />ECM 3 Building Mechanical Upgrade <br />$19 663 <br />ECM 4 Water Conservation <br />$48,497 <br />ECM 5 Roof <br />$18,737 <br />Total Annual Capital Avoidance Savings <br />$184 472 <br />Confidential & Proprietary Information of Ameresco, Inc. <br />Page 58 <br />