My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Leeper Park Rose Garden Irrigation - Wissco Irrigation Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - Leeper Park Rose Garden Irrigation - Wissco Irrigation Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:34:46 PM
Creation date
9/26/2017 3:09:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S QUOTE FOR .,PUBLIC WORK <br />PROJECT NAME: Leeper Park Rose Garden Irrigation <br />PROJECT NO. 1021-2017 <br />QUOTES DUE September 26th, 2017 @ 9:30am. <br />(Must be completed for all quotes. Please type or print) <br />Date: q- 26 ^Zal % Firm: ►55C.0 1 rr.'q�d'ia•+ x4e- <br />Address: /920 5ow+4 Be.,,%J Aue <br />City/Stateizip: 456&,4'� 2ev.J TIN Telephone Number:( %y) 2 27 98S/ <br />Agent of Bidder (if Applicable): G rgA U <br />Pursuant to notices given, the undersighed offers to furnish labor and/or material necessary to complete the <br />public works project of: j t <br />/-eve., ?.+.r14 Se GA -,dean r�• G,�har► <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated — .._......_._ <br />� 6 — ! ] ] for the sum of enter the Total Quote as shown on the Proposal) <br />-T� tkol-s'*4 Tikre'Q hwndrad Ef4k�. aid h roa (s A% no } <br />(Enter Sum of Total Quote plus Alternates sTiowfi on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />le <br />By � 4eAyw, — <br />Si ature) <br />'-r <br />(Prinled Name of Pers .,, Signing) <br />ACCEPTANCE <br />The above quote is accepted this day of 20 <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President Suzanna M. Fritzberg, Member <br />Elizabeth A. Maradik, Member Therese J. Dorau, Member <br />James A. Mueller, Member Attest: Linda M. Martin, Clerk <br />Version 10/18/2016 Page -12 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.