Laserfiche WebLink
25. Other services performed or furnished by Engineer not otherwise provided for in this <br />Agreement. <br />A2.02 Additional Services Not Requiring Owner's Written Authorization <br />B. Engineer shall advise Owner in advance that Engineer is will immediately commence to perform <br />or furnish the Additional Services of the types listed below. For such Additional Services, Engineer <br />need not request or obtain specific advance written authorization from Owner. Engineer shall cease <br />performing or furnishing such Additional Services upon receipt of written notice from Owner. <br />1. Services in connection with work change directives and change orders to reflect changes <br />requested by Owner. <br />2. Services in making revisions to Drawings and Specifications occasioned by the acceptance <br />of substitute materials or equipment other than "or -equal" items; services after the award of <br />the Construction Contract in evaluating and determining the acceptability of a proposed "or <br />equal" or substitution which is found to be inappropriate for the Project; evaluation and <br />determination of an excessive number of proposed "or equals" or substitutions, whether <br />proposed before or after award of the Construction Contract, <br />3. Services resulting from significant delays, changes, or price increases occurring as a direct <br />or indirect result of materials, equipment, or energy shortages. <br />Page 3 <br />