My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Jones Petrie Rafinksi - Howard Park Lodge ADA Accessibility
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Jones Petrie Rafinksi - Howard Park Lodge ADA Accessibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:41:02 AM
Creation date
9/13/2017 2:13:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
25. Other services performed or furnished by Engineer not otherwise provided for in this <br />Agreement. <br />A2.02 Additional Services Not Requiring Owner's Written Authorization <br />B. Engineer shall advise Owner in advance that Engineer is will immediately commence to perform <br />or furnish the Additional Services of the types listed below. For such Additional Services, Engineer <br />need not request or obtain specific advance written authorization from Owner. Engineer shall cease <br />performing or furnishing such Additional Services upon receipt of written notice from Owner. <br />1. Services in connection with work change directives and change orders to reflect changes <br />requested by Owner. <br />2. Services in making revisions to Drawings and Specifications occasioned by the acceptance <br />of substitute materials or equipment other than "or -equal" items; services after the award of <br />the Construction Contract in evaluating and determining the acceptability of a proposed "or <br />equal" or substitution which is found to be inappropriate for the Project; evaluation and <br />determination of an excessive number of proposed "or equals" or substitutions, whether <br />proposed before or after award of the Construction Contract, <br />3. Services resulting from significant delays, changes, or price increases occurring as a direct <br />or indirect result of materials, equipment, or energy shortages. <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.