REVISION 2
<br />BASE BID PART C {Derue Court and Hotel Site)
<br />Item No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />1
<br />LS
<br />5,000.00
<br />5,000.00
<br />2
<br />Video Record
<br />1
<br />LS
<br />500.00
<br />500.00
<br />3
<br />Inspection Hale
<br />2
<br />EACH
<br />1,375,00
<br />2,750.00
<br />4
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />10 000.00
<br />10,000.00
<br />5
<br />Clearing of Right of Way
<br />1
<br />LS
<br />5,000.00
<br />5,000.00
<br />6
<br />Structure, Remove
<br />2
<br />EACH
<br />500.00
<br />1,000.00
<br />7
<br />Pipe, Abandon
<br />83
<br />LFT
<br />40.00
<br />3,320.00
<br />8
<br />Excavation, Common
<br />263
<br />CYS
<br />25.00
<br />6,575.00
<br />9
<br />Temporary Erosion Control
<br />1
<br />LS
<br />1,000.00
<br />1.000.00
<br />10
<br />Temporary Inlet Protection
<br />7
<br />EACH
<br />375.00
<br />2,625.00
<br />11
<br />Surface Milling, Asphalt
<br />672
<br />SYS
<br />6.70
<br />4,502.40
<br />12
<br />HMA Patching, Type A
<br />37
<br />TON
<br />285.00
<br />10,545.00
<br />13
<br />HMA Surface
<br />55
<br />TON
<br />154.00
<br />8 470.00
<br />14
<br />Compacted Aggregate, No 53
<br />652
<br />TON
<br />23,00
<br />14,99600
<br />15
<br />Sidewalk, PCCP, 5 IN
<br />387
<br />SYS
<br />67.00
<br />26,929.00
<br />16
<br />Sidewalk, Decorative, 5 IN
<br />75
<br />SYS
<br />114.00
<br />8,550.00
<br />17
<br />Sidewalk, PCCP, Radiant
<br />226
<br />SYS
<br />222.00
<br />50 172.00
<br />18
<br />Concrete, PCCP, Reinforced, 6 IN
<br />1120
<br />SYS
<br />95.00
<br />106,400.00
<br />19
<br />Concrete, PCCP, Reinforced, Colored,
<br />6IN
<br />165
<br />SYS
<br />115.00
<br />18,975.00
<br />20
<br />Curb Ramp, Concrete
<br />35
<br />SYS
<br />250.00
<br />8 750.00
<br />21
<br />Standard Curb, Concrete
<br />868
<br />LFT
<br />27.00
<br />23 436.00
<br />22
<br />Storm Sewer Pipe, 24 IN, Perforated
<br />120
<br />LFT
<br />129.00
<br />15 480.00
<br />23
<br />Storm Sewer Pipe, 12 IN
<br />13
<br />LFT
<br />205.00
<br />2,665.00
<br />24
<br />Drywell, 6 FT Diameter
<br />3
<br />EACH
<br />2,600.00
<br />7,800.00
<br />25
<br />Storm Trench, INDOT No. 8 Aggregate
<br />80
<br />CYS
<br />65.00
<br />5,200.00
<br />26
<br />Geotextile Fabric
<br />6,864
<br />SFT
<br />0.08
<br />549.12
<br />27
<br />Light Standard, Type C
<br />2
<br />EACH
<br />1,890.00
<br />3,780.00
<br />28
<br />Light Standard, Type D
<br />1
<br />EACH
<br />2,010.00
<br />2,010.00
<br />29
<br />Light Standard, Type E
<br />2
<br />EACH
<br />1,850.00
<br />3,700.00
<br />30
<br />Light Pole Foundation
<br />3
<br />EACH
<br />600.00
<br />1,800.00
<br />31
<br />Conduit, PVC, Schedule 80, 2 IN
<br />338
<br />LFT
<br />4.50
<br />1,521.00
<br />Version 10/17/2016 Contractor's Bid for Public Works - 10