Laserfiche WebLink
REGULAR MEETING <br />AUGUST 22, 2017 257 <br />Bid was signed by: Matthew Cain <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: Base Bid Part A Bid Total: $97,694.50 <br />Base Bid Part B Bid Total: $69,666.50 <br />Base Bid Part C Bid Total: $501,530.35 <br />Alternate Part B1 Bid Total: $48,417.50 <br />SELGE CONSTRUCTION CO., INC. <br />2833 S. I lth Street <br />Niles, MI 49120 <br />Bid was signed by: Robert Kuhns <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: Base Bid Part A Bid Total: $139,754.45 <br />Base Bid Part B Bid Total: $83,112.65 <br />Base Bid Part C Bid Total: $493,756.52 <br />Alternate Part B1 Bid Total: $68,078.85 <br />Total Base Bid plus Alternates: $784,702.47 <br />RIETH-RILEY CONSTRUCTION CO., INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />Bid was signed by: Joshua McCormick <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: Base Bid Part A Bid Total: $158,174.75 <br />Base Bid Part B Bid Total: $108,119.75 <br />Base Bid Part C Bid Total: $499,273.30 <br />Alternate Part B 1 Bid Total: $77,179.75 <br />Mr. Schmidt wanted to note on the record that Selge Construction Co., Inc. scribbled and re- <br />wrote in a different total for the amount on page 2 of the bid documents. Upon a motion made <br />by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were referred to <br />Community Investment and Engineering for review and recommendation. <br />OPENING OF BIDS — DEMOLITION OF HOWARD PARK RECREATION CENTER <br />PROJECT NO. 117-058 (REDA TIF) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />G.E. MARSHALL, INC. <br />1351 Joliet Rd. <br />Valparaiso, IN 46385 <br />Bid was signed by: Frank Marshall <br />