My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - McCormick Engineering - Southfield Lake Drainage Study
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - McCormick Engineering - Southfield Lake Drainage Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:45:04 AM
Creation date
8/23/2017 1:49:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT J, consisting of 1 pages, referred to in <br />and park of the Agreement between Owner and Engineer <br />for Professional Services dated Ai�2, 2017. <br />Special Provisions <br />Paragraph(s) A1.02 to A1.06 of Exhibit A of the Agreement is/are amended to include the following <br />agreement(s) of the parties: <br />Basic Services of this Agreement are limited in scope to the Study and Report Phase outlined in paragraph <br />A1.01 of Exhibit A, unless specific modifications or changes in the scope are agreed upon by both parties. <br />.......... <br />Page 1 <br />(Exhibit J - Special Provisions) <br />EJCDC E-500Agreement Between Owner and Engineer for Professional Servioea <br />Copyright O 2008 National Society of Professional Engineersfor EJCDC. All rightsreserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.