My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Bowen Street Drainage Improvements Project No. 116-082A - Walsh & Kelly, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - Bowen Street Drainage Improvements Project No. 116-082A - Walsh & Kelly, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:30:17 PM
Creation date
8/23/2017 1:29:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IECHUBB GROUP OF INSURANCE COMPANIES <br />Surely Department, 16 Mountain View Road, P.O. Box 1616, Warren, NJ 07061-1616 <br />CDMUE3E3 Phone: (908) 903-3485 • Facsimile: (908) 903-3656 <br />AIA DOCUMENT A310"m - 2010 <br />BID BOND <br />Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. <br />CONTRACTOR <br />(Name, legal status and address). <br />Walsh & Kelly, Inc. <br />24358 State Road 23 <br />South Bend, IN 46614 <br />OWNER <br />(Name, legal status and address): <br />City of South Bend <br />Board of Public Works <br />County -City Building, Room 1316 <br />227 W. Jef€rerson Blvd. <br />South Bend, IN 46601 <br />BOND AMOUNT: <br />In the amount of five percent (5%) of the total quote. <br />PROJECT: <br />(Name, location or address, and Project number, if any) <br />Bowen Street Drainage Improvements <br />Project No. 116-082A <br />SURETY (Name, legal status and principal place of business): <br />Federal Insurance Company <br />15 Mountain View Road <br />Warren, N.J. 07059 <br />The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety <br />bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The <br />conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or <br />within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the <br />Owner In accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract <br />Documents, with a surety admitted In the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance <br />of such Contract and for the prompt payment of labor and material furnished In the prosecution thereof, or (2) pays to the Owner the <br />difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the <br />Owner may in good faith contract with another party to perform the worst covered by said bid, then this obligation shall be null and void, <br />otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to <br />extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty <br />(60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall <br />obtain the Surety's consent for an extension beyond sixty (60) days. <br />If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be <br />Subcontractor and the term Owner shall be deemed to be Contractor. <br />printed in cooperation with the American Institute of Architects (AIA) by the Chubb Group of Insurance Companies. The language in this document <br />conforms to the language used In AIA Document A310-- 2010. <br />Fdm I&02-W&FED (Ed. 7-10) <br />
The URL can be used to link to this page
Your browser does not support the video tag.