My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Marriott Hotel Site Development at Hall of Fame, Phase 3 Project No. 117-064 - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Marriott Hotel Site Development at Hall of Fame, Phase 3 Project No. 117-064 - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 9:46:22 AM
Creation date
8/23/2017 1:14:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(ar�r�iffurnie jorf (�ax�l�ftctti�a�t <br />ISSUED BY <br />. a 39r:RMhnVTd Jut <br />INDIANAPOLIS, 1N June 17, 20#6 <br />TO <br />RIETH RILEY CONSTR.UCTTON <br />GOSHE'T, IN <br />who has filed with the Department a Contractor's Statement of Experience and Financial Condition as <br />required under Indiana Code 8-23-10, is hereby qualified to bid at any Department of Transportation <br />letting In Classes of Work and within the amount and other limitation of each classification as listed <br />below, forsuch period as the uncompleted work on hand from all sources does not exceed theAggregate <br />amount. Classification references by name or symbol are in accordance with the definitions in the <br />Contractor's Statement of Experience and Financial Condition. This certificate supersedes any certificate <br />previously Issued, but is subject to revision or revocation according to the law, if and when changes <br />In the financial condition of the contracting firm or other facts justify such revision or revocation. <br />Valid August 1, 2016 Thru 1* 31, 2017 <br />AGGREGATE........................................................:...................................................................... SUNLh�]ITED <br />0085 CLFANlSEALCRAM/JONTS: PCCP11L14APVNff.............................................................................. S5,000,000 <br />0103 3-SIDED BO\ STRUCTUR£(S) W/SPA,\I>20FT............ .... ........ .................. .............................. .............. SUNi2MITED <br />0290 SEWER AND PIPE CLEANING AkNL D LINNG................................................................................... $5,000,000 <br />0313 TRAFFIC CONTROL:SNO4V AND ICE REMOVAL .............................................. SUNLIa m-rcn <br />0390 INDERSEAL wATERPROOPING NM'i'v BRAKE ................... <br />A(A) <br />A(B) <br />B(A) <br />C(A) <br />C(B) <br />D(A) <br />D(B) <br />D(C) <br />E(C) <br />E(E) <br />E(F) <br />E(IR) <br />E(R) <br />E(T) <br />CONCRETE PAVEMENT, GENERAL ................................. <br />CONCRETE PAVEMENT, LINIITED.................................. <br />...................... .................. .............. SUkILIl4IIT1 D <br />................ 1.......... ..............-.... STJ1\LMTED <br />................ ................... ..........$IJNT a D <br />ASPHALT PAVING: CERT HNPA PLANT .......... ........................ ..................... ,.............._............. .$III II Ilvf1'I'I D <br />EEAVYGRADING ........................................................................................................ ............................................................. SUNLTivAI'I'ED <br />LIGHT GRADING .... :........ .......................... <br />................................................... :........................................... STMINiI'TI;D <br />RVN OR RR BRIDGES OVER WATER ................... ............................................................................ ..... $UNLMTED <br />HWY OR RR BRIDGES OVER IIIGHWAYS.......... ................................ -............. .......... .. .. . ..................SUIv7.PAITED <br />. <br />HVR`YBRIDGES REQ PROTECTION OF RR TRACKS ........................ ................... <br />.............. ................... SiJhLRvfffED <br />BRIDGE DECK OVERLAY AND Tv -UN -OR REPAIR ............................................ ................. ..................... SUNLD&TE;D <br />SNfALL STRUCWRES AND DRAINAGE 1TEIAS........................................... ............ . .......................... SUNLJMITED <br />.. <br />SURFACE MASONRY AND MISC COXCRETE........ ............................. .............. .............................. .....SUNLMITE.D <br />DEEP SEWER AND/OR EXCAVATION ...... ............. I .................................... .............. ......SUNLRYITI'F,D <br />..................... . <br />ROAD IvIILLNOz............... SUNLIIvCTTED <br />DEMOLITION...................:..................................... <br />PREQUALI 1CATtON ENGINEER <br />State FcmC20508 (R3 / 5-05) <br />.... ................... .................... .................$TJNL' I= <br />s <br />4 <br />la*t <br />%/,,,,, CQMIAISSIONER <br />
The URL can be used to link to this page
Your browser does not support the video tag.